Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66,050Admitted-Finance | ₹66,050 | L1 | Admitted-Finance |
| 2 | L2₹1.6 L+₹91,440 (138.4%)Admitted-Finance | ₹1.6 L+₹91,440 (138.4%) | L2 | Admitted-Finance |
| 3 | L3₹1.8 L+₹1.2 L (174.4%)Admitted-Finance | ₹1.8 L+₹1.2 L (174.4%) | L3 | Admitted-Finance |
| 4 | L4₹2.0 L+₹1.4 L (210.1%)Admitted-Finance 01 BUILDING NO 69 MADHAV TOWER CO HOU SOC LTD SHANTI PARK MIRA ROAD E | MIRA ROAD | MAHARASHTRA | ₹2.0 L+₹1.4 L (210.1%) | L4 | Admitted-Finance |
| 5 | L5₹2.3 L+₹1.6 L (241.6%)Admitted-Finance | ₹2.3 L+₹1.6 L (241.6%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Raj Refrigeration and CO. L1 | Star Electric L2 | New Field L5 | M/s. Miracle Electrical Solutions India Pvt. Ltd. L4 | Utility Enterprises L3 |
|---|---|---|---|---|---|---|---|---|
| 1.10Annexure-A Air conditioning unit Preventive Maintenanace & Comprhensive Maintenanace | ||||||||
| 1.20 | ITEM NO. 1
Providing comprehensive maintenance contract for80/120/150 ltr water cooler maintenance service complete as per terms and conditions. Job includes 1) Monthly servicing
2) on call repair
3) replacement of all spares within 24 hours
4) sending standby manpower for VIP movement.
5) The job include sheet metal work and plastic material with Electrical Parts, Compressor and essential Material.
6)Including Gas Charging,Fan Motor, Condenser Coil,Capacitor, SNPS,Relay,Thermostate,Steel Press Water Tape,Sedinent All Material
7) Providing every Minor and mejor Parts when it damaged or rusted parts Compressor complete as per terms and condition (MR) | 1 | Job | 700 ₹700 Lowest | 42,000 ₹42,000 | 4,100 ₹4,100 | 4,175 ₹4,175 | 3,600 ₹3,600 |
| 1.30 | ITEM NO. 2
Providing comprehensive maintenance contract for80/120/150 ltr Water Purifier annual maintenance service complete as per terms and conditions. Job includes 1) Monthly servicing
2) on call repair
3) replacement of all spares within 24 hours
4) sending standby manpower for VIP movement.
5) The job include sheet metal work and plastic material with Electrical Parts, Compressor and essential Material.
6)Including Sedinent, Carbon,Membraine, SV,Foot Valve,Carbon Block,Pre Filyer Housing,, Pipe1/4,QC Fitting All Material
7) Monthly Replacing Candle Filter and Provide Monthly Report to Engineer Incharge
complete as per terms and condition (MR) | 1 | Job | 350 ₹350 Lowest | 68,000 ₹68,000 | 2,000 ₹2,000 | 2,150 ₹2,150 | 1,650 ₹1,650 |
| 1.40 | ITEM NO. 3
Supplying, erecting, testing and commissioning self contained water cooler 230/250V 50 cycles nominal cooling capacity of 150 litres per hour and storage capacity 150 litres with partially stainless steel body As per specification and Complete Plumbing Work with UV/RO Water Purifier System. | 1 | Each | 65,000 ₹65,000 | 47,490 ₹47,490 Lowest | 2,19,500 ₹2,19,500 | 1,98,500 ₹1,98,500 | 1,76,000 ₹1,76,000 |
Tender Value
₹55.7 L
EMD Value
₹55,742
Closing Date
25 Jun 2026, 12:00 pmClosed
City Engineer
MBMC Head Office
Two Yearly Repairing and Maintenance work of water cooler and Water purifier system at Head office Bldg. Ward offices, Branch offices and Nagar Bhavan, Garden, School, Library in MBMC Area.
2026_MBMC_1308704_1
MBMC/PWD/Tender/05_03/26-27
Open Tender
Electrical and Maintenance Works
Item Rate
730 days
MBMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,180
₹55,742
20 Aug 2026
17 Jun 2026
29 Jun 2026
17 Jun 2026
25 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Annexure-A
Air conditioning unit Preventive Maintenanace & Comprhensive Maintenanace | - | - | - | - |
| 0.9 | ITEM NO. 1
Providing comprehensive maintenance contract for80/120/150 ltr water cooler maintenance service complete as per terms and conditions. Job includes 1) Monthly servicing
2) on call repair
3) replacement of all spares within 24 hours
4) sending standby manpower for VIP movement.
5) The job include sheet metal work and plastic material with Electrical Parts, Compressor and essential Material.
6)Including Gas Charging,Fan Motor, Condenser Coil,Capacitor, SNPS,Relay,Thermostate,Steel Press Water Tape,Sedinent All Material
7) Providing every Minor and mejor Parts when it damaged or rusted parts Compressor complete as per terms and condition (MR) | 1 | Job | - | - |
| 0.0 | ITEM NO. 2
Providing comprehensive maintenance contract for80/120/150 ltr Water Purifier annual maintenance service complete as per terms and conditions. Job includes 1) Monthly servicing
2) on call repair
3) replacement of all spares within 24 hours
4) sending standby manpower for VIP movement.
5) The job include sheet metal work and plastic material with Electrical Parts, Compressor and essential Material.
6)Including Sedinent, Carbon,Membraine, SV,Foot Valve,Carbon Block,Pre Filyer Housing,, Pipe1/4,QC Fitting All Material
7) Monthly Replacing Candle Filter and Provide Monthly Report to Engineer Incharge
complete as per terms and condition (MR) | 1 | Job | - | - |
| 0.9 | ITEM NO. 3
Supplying, erecting, testing and commissioning self contained water cooler 230/250V 50 cycles nominal cooling capacity of 150 litres per hour and storage capacity 150 litres with partially stainless steel body As per specification and Complete Plumbing Work with UV/RO Water Purifier System. | 1 | Each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_2245454.xls
BOQ • 0.23 MB
3.pdf
Tender Documents • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .