Tender Value
₹12.4 L
EMD Value
₹24,826
Closing Date
12 Mar 2026, 12:00 pmClosed
PRADHAN, BINNABARI GRAM PANCHAYAT
BINNABARI GRAM PANCHAYAT
Construction of New Training Centre for Self Help Group at Binnabari Gram Panchayet
2026_ZPHD_1015491_1
NIeT11/BBGP/2025-26
Open Tender
CIVIL WORKS
Percentage
90 days
BINNABARI GRAM PANCHAYAT
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹24,826
BINNABARI GRAM PANCHAYAT
8 Sept 2026
26 Feb 2026
14 Mar 2026
26 Feb 2026
12 Mar 2026
26 Feb 2026
27 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drain, in all sorts of soils (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
Depth of excavation not exceeding 1500mm. | 42.38 | M3 | 119.27 | ₹5,054.66 |
| 2 | Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150mm including watering and ramming etc. layer by layer complete. a) With earth obtain from excavation of foundation. | 42.38 | M3 | 77.54 | ₹3,286.15 |
| 2.1 | b) With carried earth, arranged by the contractor within a radius of 1 km. including cost of earth. | 26.76 | M3 | 312.71 | ₹8,368.12 |
| 3 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 169.12 | M2 | 24 | ₹4,058.88 |
| 4 | Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety.
In ground floor
6 : 3 : 1 proportion. | 13.92 | M3 | 3,257.92 | ₹45,350.25 |
| 5 | Brick work with 1st. class Bricks in cement mortar(6:1)
In foundation & plinth | 16.16 | M3 | 4,838.25 | ₹78,186.12 |
| 6 | 125mm. thick Brick work with 1st. class bricks in cement mortar(4:1)
in Ground Floor | 96.21 | M2 | 660.33 | ₹63,530.35 |
| 7 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes
River Bazree in ground floor. | 19.99 | M3 | 4,497.39 | ₹89,902.83 |
| 8 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. including supply of rods, initial straightening and removal of loose rust(if necessary) cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
Tor steel / Mild steel
Other than SAIL / TATA / RINL | 1.88 | MT | 60,423.96 | ₹1,13,781.81 |
| 9 | P-101 ,I-2 M.S. structural works with hollow sections ( square or rectangular shape) conforming to IS: 806-1957 & IS:1161-1958) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1956 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete. Payment to be made on the basis of calculated weight of structural memebrs of MS Holow Section as specified in relevent IS code in
finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finishedstructural members. The rates are considered for a hight of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each | 3.86 | MT | 59,943 | ₹2,31,446.16 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.07 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.19 MB
BOQ_2494454.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .