Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.2 LAccepted-AOC LODHOMA HAT HANUMAN MANDIR DARJEELING 734201 | DARJEELING | DARJEELING | WEST BENGAL | 734201 | ₹22.2 L | L1 | Accepted-AOC Quoted Lowest Rate. |
| 2 | L2₹23.3 LRejected-Finance | ₹23.3 L | L2 | Rejected-Finance Did not quote Lowest Rate. |
| 3 | L3₹23.3 LRejected-Finance RHP IB COMPLEX LODHOMA DARJEELING 734201 | DARJEELING | DARJEELING | WEST BENGAL | 734201 | ₹23.3 L | L3 | Rejected-Finance Did not quote Lowest Rate. |
| 4 | L4₹23.3 LRejected-Finance KANKEBONG BUSTY P O P S LODHAMA LODHAMA DARJEELING 734201 | LODHAMA | DARJEELING | WEST BENGAL | 734201 | ₹23.3 L | L4 | Rejected-Finance Did not quote Lowest Rate. |
Tender Value
₹21.2 L
EMD Value
₹42,314
Closing Date
10 Feb 2026, 11:00 amClosed
Project Manager, RHP, St-II
Administrative Building, Dovan, Lodhoma, Darjeeling, 734201
Repair, maintenance and minor civil works for the road from Lodhoma Bifurcation Point (Link Road) to Rammam Intake, Helipad to Adit and upper penstock road (other than bituminous road) under Rammam Hydel Project, St-II.
2026_WBSED_992357_4
PM/RMM/e-Tender/CIVIL/25-26/19 Dated.21.01.2026
Open Tender
CIVIL WORKS
730 days
Rammam Hydel Project, St-II
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹42,314
6 Apr 2026
29 Jan 2026
12 Feb 2026
29 Jan 2026
10 Feb 2026
29 Jan 2026
Cleaning of box type drain along the road and removal of silt ,slip and uprooting weeds, if any, upto height of 1 mtr. On hill side
Cleaning of 'V' type drain along the road and removal of silt ,slip and uprooting weeds, if any, upto height of 1 mtr. On hill side
Dressing and chilchalling Road flanks including cutting and filling with earth up to 150 mm average thickness finished with outward cross-grade of 1 in 30.
Cutting of branches of trees shrubs and trimming of grass and weeds ii) Cutting of shrubs from the road way or with in R.O.W and disposal of shrubs to suitable locations as per technical specifications Clause 1914 for Rural Roads of MORD.
Clearing grass and removal of rubbish upto a distance of 30m outside the periphery of the area as per Technical Specifications Clause 201 for Rural Roads of MORD. By Manual Means
Land Slide Clearance in Soil Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side.
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Excavation in Hard Rock (blasting prohibited) Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections as per Clause 301 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (Mode of measurement: pre works and post works)
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics excluding rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor - (b) River Bazree - 1:3:6 proportion.
Ordinary Cement concrete (mix 1:2:4 ) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. (b) River bazree
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (ii ) River Bazree
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. ii) (1:3:6) proportion.
Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site(a) In Road and Jhora Work.
Weaving wire mattress as directed with wire of 4mm dia. and making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the Engineer-in-charge including cost of supply of G.I. wire. (With 100mm x 100mm mesh.)
Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge. [Rate provided is exclusive of the cost of stone boulders and sausage crate]
Removal of Unserviceable Soil with Disposal upto 1000 metres Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per Technical Specification Clause 302.3.11 for Rural Roads of MORD. (Mode of measurement: pre works and post works)
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required ,
Providing weep holes in Brick masonry / Plain /Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD. (I) By Manual Means
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:6 cement mortar ,20mm thick plaster
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothing surface by sand paper etc.
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary (a) On timber or plastered surface With super gloss (hi-gloss) (iv) Two coats (with any shade except white)
Scraping of moss, blisters etc. thoroughly from exterior surface of walls necessitating the use of scraper, wire brush etc.
Supplying/Providing and laying of Filter media with granular materials/stone crushed aggregates/brick aggregates/river bed materials satisfying the requirements laid down in clause 2504.22 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to full height compacted to a firm condition complete as per drawing and technical specification.
Items covering based on Based on P.W. D, W.B ., S.O.R Bldg w.e.f 01.11.2017 (11th corrigenda 14.02.2020) & Roads w.e.f 30.08.2018 (8th corrigenda 22.07.2020) and S&P w.e.f. 01.11.2017 (7th corrigenda dtd. 22.01.2020)
Non schedule Item (Rate should be analysed from present market rates of different element in the item against documentary evidence with 5% overhead charge 10% contractors profit & 1% BOCWW Cess towards BOCWW Act 1996. In that case contractual rate will not be applicable
Add BOCW cess @1% on the rate of all above items
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_2426700.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid