Loading…
Loading…
Tender Value
₹3.2 L
EMD Value
₹32,081
Closing Date
13 Jul 2026, 3:00 pm5d left
chief engineer
CHIEF ENGINEER
Construction work on the new culvert at Tota Chowk Ward No 46.
2026_NNSAH_1166952_1
6264 B
Open Tender
Civil Works
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹32,081
6 Jul 2026
6 Jul 2026
14 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) Including lift upto 1.50 M. and lead upto 30 M. and including filling watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in- charge upto a distance of 30 M. from the foundation trenches | 30.72 | cum | 90 | ₹2,764.8 |
| 2 | Disposal of Excavated Soil up to 5.00 KM distance complete with labour T&P ETC at site. | 24.58 | cum | 130 | ₹3,195.4 |
| 3 | Cement Concrete in proportion of 8:4:1 with 4cm guage approved stone ballast, Coarse sand & cement in the materials, labour Tools & plants etc. required for proper completion of the work. | 8.46 | cum | 4,850 | ₹41,031 |
| 4 | R.C.C. Work with cement, approved coarse sand & 2 cm guage approved stone grit in proportions of 1:1.5:3 in lintels of door & windows excluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work, including cost of binding wire. The rate excludes making of drip course which shall be paid extra. | 12 | cum | 7,400 | ₹88,800 |
| 5 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape as necessary inclnding bending for proper complition of the work and including supply of all steel & wastage, bend, hooks and authorised overlapping hall be measured | 1,083 | kg | 85.29 | ₹92,369.07 |
| 6 | M-150Brick work in one cement & Four course sand mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. | 0.43 | cum | 4,690 | ₹2,012.01 |
| 7 | 12 mm thick plaster with cement and ccorse sand of 1:25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm including supply of all materials labour t&p etc. | 1.84 | sqm | 165 | ₹303.6 |
| 8 | Plain Cement Concrete with 2c.m.gauge approved stone balliast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | 7.2 | cum | 5,750 | ₹41,400 |
| 9 | Add 18%GST | 1 | No | 48,935.12 | ₹48,935.12 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.47 MB
BOQ_2188759.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid