Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.8 LAccepted-AOC | ₹20.8 L Quoted ₹21.5 L | L1 | Accepted-AOC LOWEST BID |
| 2 | L2₹28.2 L+₹6.6 L (30.8%)Rejected-Finance FLAT NO 101 2ND FLOOR RAGHAVENDRA RESIDENCY PLOT NO 1 2 3 SURVEY NO 27 PICKET SECUNDERABAD 500026 | HYDERABAD | TELANGANA | 500026 | ₹28.2 L+₹6.6 L (30.8%) | L2 | Rejected-Finance Not being L1 bidder |
| 3 | L3₹28.4 L+₹6.9 L (32.0%)Rejected-Finance | ₹28.4 L+₹6.9 L (32.0%) | L3 | Rejected-Finance Not being L1 bidder |
| 4 | L4₹28.5 L+₹7.0 L (32.6%)Rejected-Finance HOUSE NO 2 4 136 LINGREDDY MANSION BLOCK NO IV OPP HANUMAN TEMPLE TADBUND SECUNDERABAD 500009 | SECUNDERABAD | HYDERABAD | TELANGANA | 500009 | ₹28.5 L+₹7.0 L (32.6%) | L4 | Rejected-Finance Not being L1 bidder |
| 5 | L5₹33.4 L+₹11.9 L (55.3%)Rejected-Finance 1 6 620 CHAITANYAPURI INDRA NAGAR DILSUKHNAGAR HYDERABAD TELANGANA 500060 UDYAM TS 09 0007870 37AAEPO0535A1Z8 B 36AAEPO0535A1ZA R MSME STATUS AS VERIFIED | RANGA REDDY | TELANGANA | 500060 | ₹33.4 L+₹11.9 L (55.3%) | L5 | Rejected-Finance Not being L1 bidder |
| Sl No | Description | Qty | Unit | MS ENTERPRISES L3 | L and S ENTERPRISES L2 | M/S AMRIT DAS MAHAPATRA L6 | omsai thermax engineers L4 | DPS sales and services india L5 | Srinivash Engineers L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Repair/ maintenance, excluding major spares but including regular maintenance of the Automatic Power factor correction panel capacity up to 100 KVARs and up 8 stages installed at various locations at GP adjoining area including carrying out complete maintenance/ repairs as required of all the sub systems viz. based control panels, feeder pillar, APFC relay, Power capacitor bank, Power contactors, Control wiring, Monitoring CT, MCBs/ MCCBs for isolation (with all the accessories) any breakdown maintenance and replacement of unserviceable parts, refixing of old serviceable parts/ new parts if any project completion and trouble shooting responsibility also lies with contractor including following provisions complete all as specified and directed. | 2 | EACH JOB | 2,397 ₹4,794 | 5,400 ₹10,800 | 15,000 ₹30,000 | 4,500 ₹9,000 | 8,000 ₹16,000 | 2,000 ₹4,000 Lowest |
| 1.01Notes for item 1.00 above:- (i) Rate quoted by tenderer is deemed to be inclusive of checking of system fortnightly, replacement of defective control wiring, small part such as Push button, lugs any auxiliary contact, auto selector switch etc and necessary servicing repair by expert technician and register will be maintained for the same. (ii) The scope of work includes the labour charges required for removing, repairing, refixing, carrying out electrical termination, capacitors bank, APFC relay, power contactor, control CT, MCBs/ MCCB and fixing/ installing/ testing and commissioning the complete system. (iii) capacitors bank, APFC relay, power contactor, control CT, MCBs/ MCCB shall be measured and paid separately | |||||||||
| 2.00 | Supply only power factor correction capacitor, for capacitor bank of capacity 5 KVAR, heavy duty 440 volts 50 Hz complete including taking down old unserviceable capacitor complete all as specified and directed. | 10 | EACH | 993 ₹9,930 | 1,260 ₹12,600 | 1,800 ₹18,000 | 990 ₹9,900 Lowest | 2,400 ₹24,000 | 1,000 ₹10,000 |
| 2.01 | All as per item No 2.00 above but 10 KVAR Capacitor Bank | 10 | EACH | 1,663 ₹16,630 Lowest | 2,250 ₹22,500 | 3,300 ₹33,000 | 1,800 ₹18,000 | 5,500 ₹55,000 | 1,900 ₹19,000 |
| 2.02 | All as per item No 2.00 here-in-before but 20 KVAR Capacitor Bank | 8 | EACH | 2,763 ₹22,104 Lowest | 4,500 ₹36,000 | 6,300 ₹50,400 | 3,600 ₹28,800 | 12,000 ₹96,000 | 4,000 ₹32,000 |
| 2.03 | All as per item No 2.00 here-in-before but 25 KVAR Capacitor Bank | 4 | EACH | 3,347 ₹13,388 Lowest | 6,120 ₹24,480 | 7,800 ₹31,200 | 4,500 ₹18,000 | 14,000 ₹56,000 | 5,000 ₹20,000 |
| 3.00 | S&F in replacement of old U/ s APFC relay etaCON M series with auto-set function 5 stage including taking down old unserviceable one complete all as specified and directed. | 2 | EACH | 4,963 ₹9,926 | 11,700 ₹23,400 | 12,852 ₹25,704 | 9,000 ₹18,000 | 7,000 ₹14,000 | 3,800 ₹7,600 Lowest |
| 3.01 | All as per item No 3.00 here-in-before but APFC relay with auto-set function 7 stage | 2 | EACH | 5,699 ₹11,398 | 12,600 ₹25,200 | 15,300 ₹30,600 | 12,600 ₹25,200 | 9,000 ₹18,000 | 4,000 ₹8,000 Lowest |
| 3.02 | All as per item No 3.00 here-in-before but APFC relay with auto-set function 8 stage | 2 | EACH | 7,663 ₹15,326 | 12,600 ₹25,200 | 15,500 ₹31,000 | 12,600 ₹25,200 | 11,000 ₹22,000 | 4,500 ₹9,000 Lowest |
| 4.00M&L for attending, repair and rectification of external LT electric supply complaints on up to 1100 Volts grade, over head/ underground system alongwith necessary T&P, safety devices as per site requirement for the following type of complaints complete all as specified and directed:- | |||||||||
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
6 Sept 2025, 6:00 pmClosed
GE (UTILITY) SECUNDERABAD
GE UTILITY SECUNDERABAD MUDFORT SECUNDERABAD-500003
REPAIRS / RENEWAL OF OH LINE, LT UG CABLE, LT POLE, RE-STRIGING OF OH LINE, CUTTING TREE BRANCHES, CAPACITOR PANEL, HIGH MAST, AMF PANEL AND ALLIED WORKS AT MH, GOLDEN PALM, STN WORK SHOP AND ADJOINING AREA UNDER AGE EM II OF GE (U) SECUNDERABAD
2025_MES_725409_1
GE (U)/SEC/TOKEN/34 OF 2025-26
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
SECUNDERABAD
AS PER NIT
8 documents required · 8 mandatory
₹500
GE (UTILITY) SECUNDERABAD
₹70,000
Yes
7 Nov 2025
9 Aug 2025
13 Sept 2025
9 Aug 2025
6 Sept 2025
23 Aug 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .