Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
5 Feb 2024, 2:00 pmClosed
Chief Engineer, PWD (Roads), Guwahati-3
O/o the Chief Engineer, PWD (Roads), Guwahati-3
Improvement of (1) Road from Godwin School to Suryadoynagar Shivmandir Road, South Garolia and (2) Pragati Nagar (Ramdhenu Path) at Beharbari Sonkuchi under Mukhya Mantrir Paki Path Nirman Aachani for the year 2023-24.
2024_PWD_35571_3
CE/CW/40/2023-24/1_MMPPNA
Open Tender
Civil Works – Roads
Item Rate
90 days
Behorbari, Guwahati
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,000
₹3.0 L
Yes
O/o the Chief Engineer, PWD (Roads), Guwahati-3
16 Apr 2024
20 Jan 2024
5 Feb 2024
20 Jan 2024
5 Feb 2024
20 Jan 2024
20 Jan 2024 - 5 Feb 2024
29 Jan 2024
Amount
Godwin school to Suryoday Nagar Road Labour for removal of mud soil silt from the road surfaces / debries from the road side drain deposited at road side for removal after excavation up to 5km out side the city area etc by truck carriage including cleaning sweeping the road surface as necessary loading and unloading with all labour and materials etc as directed by the Deptt.
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. ii ) For Grading II Material (including all lead and lift upto site)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. WBM Grading- 3 (A) By Manual Means. (including all lead and lift upto site)
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. Including edge restraint /edge block
Providing & fixing retro – reflectorised cautionary, mandatory and informatory sign as per IRC:67 made encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and technical specification Clause 801 ii) 600mm equilateral triangle
Providing & fixing retro – reflectorised cautionary, mandatory and informatory sign as per IRC:67 made encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and technical specification Clause 801 ii) 600mm circular
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. I) Ordinary soil (A) Manual means
Earthwork in exavation for foundation of structure as per drawings and technical specification clause 307 including setting out construction of shoring and bracing deleterious matter, dressing of sides and bottom and backfilling with approved material
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
Providing and laying of dry rubble flooring at cross drainage work for relatively less important works complete as per drawings and technical specifications Clause 1303.3
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 A) With crushed Stone Nominal mix 1:2.5:5 (Hand mixing)
Plain cement concrete 1:3:6 nominal mix in open foundations with crushed stone aggregate 40mm nominal size mechanically mixed place in foundation and compacted by vibration including curing 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 A) With crushed Stone Nominal mix 1:2.5:5 (Hand mixing)
Stone masonry in cement mortar 1:3 for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork Without plasticiser Height upto 5m B) RCC Grade M20, Using concrete mixer
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Sandy material
Pragjyoti Nagar Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. ii ) For Grading II Material (including all lead and lift upto site)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. WBM Grading- 3 (A) By Manual Means. (including all lead and lift upto site)
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. Including edge restraint /edge block
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. I) Ordinary soil (A) Manual means
Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 A) With crushed Stone Nominal mix 1:2.5:5 (Hand mixing)
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (Other ISI approved TMT reinforcement bar SAI/BISCON/ THERMAX or equivalent)) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork Without plasticiser Height upto 5m B) RCC Grade M20, Using concrete mixer
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Sandy material
Routine maintanence for 1st year (Rate to be quoted at Column 13 by bidder should be same as mentioned at Column 6 )
Routine maintanence for 2nd year (Rate to be quoted at Column 13 by bidder should be same as mentioned at Column 6 )
Routine maintanence for 3rd year (Rate to be quoted at Column 13 by bidder should be same as mentioned at Column 6 )
Routine maintanence for 4th year (Rate to be quoted at Column 13 by bidder should be same as mentioned at Column 6 )
DHRUBA DEKA
HI TECH PAVERS BLOCKS ENTERPRISE
RITUPARNA BAISHYA SAUD
SUSANTA KUMAR BHATTACHARYA
M.D. ENGINEERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .