Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I Mill Plant A C Plant Unit III AOH 2026 27 Air Washer System Epoxy painting of blowers spray room and its auxiliaries Spray nozzles flushing and works replacing the damaged 200 NB GI header pipe Overhauling the AWCW Pumps etc
2026_EB_698138_1
CE / MTPS-I / SE / M-I / MP /OT.12 / 2026-27
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹4,600
Yes
25 Aug 2026
25 Aug 2026
9 Sept 2026
25 Aug 2026
8 Sept 2026
25 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for dismantling the casing cover of blowers 3A & 3B for painting and reassembling after completion of painting works. | 2 | Nos | - | - |
| 2 | Charges for scratching and cleaning, painting with epoxy zinc chromate primer one coat and epoxy smoke grey paint two coat for structures, spray room tank pipes, eliminator frame, water strainer structure, AWS Blowers 3A & 3B, dampers and ducts. | 376 | m2 | - | - |
| 3 | Charges for dismantling the water spray nipples and nozzles from the pipe line and scratching & cleaning and then re-fixing in the pipe line. | 504 | Nos | - | - |
| 4 | Charges for flushing the spray system pipe line | 1 | No | - | - |
| 5 | Charges for Pump complete overhauling and changing the worn out spares parts if necessary. | 3 | Nos | - | - |
| 6 | Charges for Refitting the pump with both suction and discharge pipe flanges with new gasket, coupling the motor with pump, checking axial and radial misalignment between pump and motor and completing the alignment within the prescribed limits and commissioning satisfactory. | 3 | Nos | - | - |
| 7 | Charges for Dismantling the Valves from the pipe line and Overhauling and then refitting of 250 mm / 200 mm AWCW Pump suction and discharge side Gate valves & drain Valve from the spray system sump tank and cleaning of seating surface and lapping of valve gate and seat for perfect matching. | 3 | Nos | - | - |
| 8 | Charges of cutting & dismantling the damaged eroded 200NB(GI) spray system Horizontal header pipe in AWS Unit-II, transporting, lead , lift and erection of new GI ERW Pipe 200NB with necessary fittings and devolution the scrap material to central stores (lorry will be provided by Board). | 1 | No | - | - |
| 9 | Charges for welding the new 200NB(GI) spray system header pipe lines with the existing 200NB MS Pipe. {The above work is inline Labour charges for IBR welding for Replacing the defective drain line valves or equivalent in Cooling water lines and ACW lines by Non IBR welder.( ERW pipe, reducer& bends) Rate for Two number Non IBR cutting and welding | 49 | Joints | - | - |
| 10 | Charges for drilling holes and welding the 40NB GI coupling in the new 200NB(GI) spray system horizontal header pipe lines | 28 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_839204.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].