Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance | -33.01% | ₹2.6 L | L1 | Admitted-Finance |
| 2 | L2₹3.2 LAdmitted-Finance | -17.00% | ₹3.2 L | L2 | Admitted-Finance |
| 3 | L3₹3.5 LAdmitted-Finance | -10.50% | ₹3.5 L | L3 | Admitted-Finance |
| 4 | L4₹3.6 LAdmitted-Finance | -8.00% | ₹3.6 L | L4 | Admitted-Finance |
| 5 | L5₹3.7 LAdmitted-Finance | -4.50% | ₹3.7 L | L5 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹7,757
Closing Date
4 Jun 2026, 4:00 pmClosed
EE(EDUCATION WING)
NDMC PALIKA KENDRA, ROOM NO 1608, 16TH NEW DELHI
Improvement to Navyug School Vinay Marg under Education Wing. SH Design Supply Fabrication and Installation of Tensile Structure Shed at Navyug School Vinay Marg
2026_NDMC_292131_1
19/EE(Education wing)/2026-27
Open Tender
Civil Works
15 days
NDMC area
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,757
5 Jun 2026
27 May 2026
4 Jun 2026
27 May 2026
4 Jun 2026
27 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm | 0.5 | Square Metre | 71.35 | ₹35.68 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:4:8 or leaner mix (including equivalent
design mix) | 0.1 | Cubic Meter | 1,461.69 | ₹146.17 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 0.5 | Cubic Meter | 253.04 | ₹126.52 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand (zone-ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.1 | Cubic Meter | 6,336.89 | ₹633.69 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level1:1.5:3 (1 Cement: 114 coarse sand (zone-ill) derivedfrom natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.5 | Cubic Meter | 8,108.34 | ₹4,054.17 |
| 6 | Design, Supply, Fabrication & Installation of Tensile Structure, Supply of Tensile Fabric, with necessary accessories, Supply of Membrane with M-tex or eqivalent Fabric M 850 -opeque GSM, support MS structure with MS column 139mmX thickness 3.5 mm , Outer Frame pipe 76 mm X thickness 3mm, arch pipe Truss Section pipe 60 X 2.5 mm thick, base plate 200 X 200 & thickness 8 mm, Foudation Boalt , MS Purling pipe tyrod ,Aluminums flat bar, zinc primer then painting with Deco Spray etc. , waterproof Membrane double sided coated all complete as per the satisfation and direction of Engineer In Charge. The area of shed shall be measured for payment. | 73 | Square Metre | 5,240.86 | ₹3,82,582.78 |
| 7 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all
lifts involved. | 1 | Cubic Meter | 256.59 | ₹256.59 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
BOQ_387802.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid