Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC first lowest |
| 2 | L2₹1.2 CrRejected-AOC | ₹1.2 Cr | L2 | Rejected-AOC second lowest |
| 3 | L3₹1.2 CrRejected-AOC | ₹1.2 Cr | L3 | Rejected-AOC third lowest |
| 4 | L4₹1.2 CrRejected-AOC | ₹1.2 Cr | L4 | Rejected-AOC fourth lowest |
| Sl No | Description | Qty | Unit | M. Vettivelan L1 | S.REX L4 | Target Builderz L2 | ASAN JAFFER ALI L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Towards the Hire charges for providing Barricading arrangements using casurina props of 10cm dia for vertical posts. The vertical posts should be placed in such a way that, they should 60cm below ground level. The barricading should be provided to a height of 1.50m from the ground level. The vertical posts are interconnected with casurina bullies of 5 to 8cm dia at equally spaced intervals. The rate includes, removal of barricading after the completion of counting works. | 2,228.13 | Rm | 160 ₹3.6 L | 298.9 ₹6.7 L | 293 ₹6.5 L | 295 ₹6.6 L |
| 2.00 | Hire charges for providing steel Barricading arrangements of 1.20m height using 40mm x 40mm MS square pipe of 20cm centre to centre interval etc. place shown by the departmental officers for maximum 35 days | 2,239 | Rm | 500 ₹11.2 L | 525.66 ₹11.8 L | 515 ₹11.5 L | 520 ₹11.6 L |
| 3.00 | Hire charges for providing weld mesh partition arrangements, Using weld mesh 7.5 x 2.50cm 10 gauge with outer frames and M.S. angles of size 15 x 15 x 5mm for the outer frames stiffeners with 32 x 6mm M.S. flat is provided of 90cm intervals for counting hall parition and way partition etc. including cost of nails, screws, binding wire and labour charges etc. and removing the same after counting is over etc. complete for maximum 35 days | 2,771.2 | M2 | 1,030 ₹28.5 L | 1,088.42 ₹30.2 L | 1,068 ₹29.6 L | 1,077 ₹29.8 L |
| 4.00 | Hire charges for providing G.I. sheet fixed partition arrangements. G.I. sheet of 14 gauge for closing the windows in storage rooms and way partition including cost of labour charges and nail and removing the same after counting is over for maximum 35 days | 570.38 | M2 | 650 ₹3.7 L | 678.2 ₹3.9 L | 665 ₹3.8 L | 672 ₹3.8 L |
| 5.00Brick work in CM 1:5 (One cement and Five crushed stone Sand) using Burnt clay Bricks of size 8-3/4" x 4-1/4" X2-3/4" of with class designation of 7.5 conforming for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. | |||||||
| 5.01 | In Ground floor | 27.26 | M3 | 5,900 ₹1.6 L | 6,723.54 ₹1.8 L | 6,594 ₹1.8 L | 6,655 ₹1.8 L |
| 5.02 | In First floor | 30.56 | M3 | 6,150 ₹1.9 L | 6,916.68 ₹2.1 L | 6,783 ₹2.1 L | 6,846 ₹2.1 L |
| 5.03 | In Second floor | 27.27 | M3 | 6,250 ₹1.7 L | 7,109.81 ₹1.9 L | 6,973 ₹1.9 L | 7,038 ₹1.9 L |
| 6.00 | Supplying and Fixing of G.I Tubular Pipe 50mmx50mm including Labour charges for Welding, cutting, loading, unloading and transportation etc | 495.8 | Rm | 337 ₹1.7 L | 378.27 ₹1.9 L | 371 ₹1.8 L | 375 ₹1.9 L |
| 7.00 | Hire charges for supplying and fixing of plywood of 19mm thick for closing the windows, ventilator in storage rooms including cost of nails, screws and labour charges etc. and removing the same after counting is over etc. complete for maximum 35 days | 470.13 | M2 | 1,400 ₹6.6 L | 1,521.31 ₹7.2 L | 1,492 ₹7.0 L | 1,506 ₹7.1 L |
Tender Value
₹1.2 Cr
EMD Value
₹70,500
Closing Date
1 Apr 2026, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, PWD., Buildings Construction and Maintenance Circle, Tirunelveli
Providing Security and Protective arrangements to Counting Hall and EVM Storage rooms for the Legislative Assembly Election for the year 2026 in University College of Engineering at Konam, Nagercoil in Kanniyakumari District
2026_PWD_675318_1
44(3) SE/2025-26 dated 25.03.2026
Open Tender
Civil Works - Buildings
35 days
Nagercoil
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹70,500
25 May 2026
27 Mar 2026
2 Apr 2026
27 Mar 2026
1 Apr 2026
27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Towards the Hire charges for providing Barricading arrangements using casurina props of 10cm dia for vertical posts. The vertical posts should be placed in such a way that, they should 60cm below ground level. The barricading should be provided to a height of 1.50m from the ground level. The vertical posts are interconnected with casurina bullies of 5 to 8cm dia at equally spaced intervals. The rate includes, removal of barricading after the completion of counting works. | ||||||
Hire charges for providing steel Barricading arrangements of 1.20m height using 40mm x 40mm MS square pipe of 20cm centre to centre interval etc. place shown by the departmental officers for maximum 35 days | - | Rm | - | - | 2 | |
| 3Hire charges for providing weld mesh partition arrangements, Using weld mesh 7.5 x 2.50cm 10 gauge with outer frames and M.S. angles of size 15 x 15 x 5mm for the outer frames stiffeners with 32 x 6mm M.S. flat is provided of 90cm intervals for counting hall parition and way partition etc. including cost of nails, screws, binding wire and labour charges etc. and removing the same after counting is over etc. complete for maximum 35 days | ||||||
| 4Hire charges for providing G.I. sheet fixed partition arrangements. G.I. sheet of 14 gauge for closing the windows in storage rooms and way partition including cost of labour charges and nail and removing the same after counting is over for maximum 35 days | ||||||
Brick work in CM 1:5 (One cement and Five crushed stone Sand) using Burnt clay Bricks of size 8-3/4" x 4-1/4" X2-3/4" of with class designation of 7.5 conforming for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. | - | - | - | - | 5 | |
| 5.01 | In Ground floor | - | M3 | - | - | 6 |
| 5.02 | In First floor | - | M3 | - | - | 7 |
| 5.03 | In Second floor | - | M3 | - | - | 8 |
| 6Supplying and Fixing of G.I Tubular Pipe 50mmx50mm including Labour charges for Welding, cutting, loading, unloading and transportation etc | ||||||
| 7Hire charges for supplying and fixing of plywood of 19mm thick for closing the windows, ventilator in storage rooms including cost of nails, screws and labour charges etc. and removing the same after counting is over etc. complete for maximum 35 days | ||||||
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
uploadingconditionnagar.pdf
Tender Documents • 1.76 MB
BOQ_811672.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid