Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 LAccepted-AOC RADHANAGAR VILLAGE PO SUNDERCHAK DIST PASCHIM BURDWAN PIN 713360 | PASCHIM BARDHAMAN | WEST BENGAL | 713360 | ₹1.2 L | 1 | Accepted-AOC Eligible L-1 bidder. |
| 2 | Rejected-Technical VILL P O CHINCHURIA DIST PASCHIM BARDHAMAN PIN 713378 W B | CHINCHURIA | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | - | - | Rejected-Technical Technically not eligible |
| 3 | Rejected-Technical VILL CHINCHURIA PO CHINCHURIA JAMURIA PASCHIM BARDHAMAN WB 713378 | JAMURIA | PASCHIM BARDHAMAN | WB | 713378 | - | - | Rejected-Technical Technically not eligible |
| Sl No | Description | Qty | Unit | MONDAL TRADERS L1 |
|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||
| 1.01Material Cost | ||||
| 1.02 | Installation of 11KV Gang Operating Switch | 1 | LS | 16,000 ₹16,000 Lowest |
| 1.03 | Dismantling of transformer from mines and installation near 4MVA more | 1 | LS | 16,000 ₹16,000 Lowest |
| 1.04 | Installation of chemical earth pits with all required material | 1 | LS | 45,338 ₹45,338 Lowest |
| 1.05Labour Cost: | ||||
| 1.06 | Installation of 11KV Gang Operating Switch | 1 | LS | 6,142 ₹6,142 Lowest |
| 1.07 | Dismantling of transformer from mines and installation near 4MVA more | 1 | LS | 12,472 ₹12,472 Lowest |
| 1.08 | Installation of chemical earth pits with all required material | 1 | LS | 2,500 ₹2,500 Lowest |
| 1.09 | P. F. amount for labour cost | 1 | no. | 2,609.69 ₹2,609.69 Lowest |
Tender Value
₹1.1 L
EMD Value
₹1,500
Closing Date
22 Jan 2026, 5:00 pmClosed
AE EnM
S.B AREA
Installation of transformer near 4MVA more under Sonepur Bazari Project.
2026_ECL_350933_1
GM/SBA/EnM/Tender/25-26/83
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
S.B.Project
Please refer tender document.
6 documents required · 6 mandatory
₹1,500
9 Apr 2026
10 Jan 2026
24 Jan 2026
12 Jan 2026
22 Jan 2026
12 Jan 2026
12 Jan 2026 - 15 Jan 2026
Item Description/ Heading
Material Cost
Installation of 11KV Gang Operating Switch
Dismantling of transformer from mines and installation near 4MVA more
Installation of chemical earth pits with all required material
Labour Cost:
Installation of 11KV Gang Operating Switch
Dismantling of transformer from mines and installation near 4MVA more
Installation of chemical earth pits with all required material
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
technical_363705.pdf
techsummary_363705.pdf
finance_363705.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tendernotice_2.pdf
PDF • 1.68 MB
Tendernotice_3.pdf
PDF • 1.17 MB
BOQ_363705.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .