| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹11.7 L (11.3%)Admitted-Finance | ₹1.2 Cr+₹11.7 L (11.3%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹17.3 L (16.8%)Admitted-Finance | ₹1.2 Cr+₹17.3 L (16.8%) | L3 | Admitted-Finance |
| 4 | L4₹1.3 Cr+₹23.0 L (22.2%)Admitted-Finance | ₹1.3 Cr+₹23.0 L (22.2%) | L4 | Admitted-Finance |
| 5 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | DURGA ELECTRICALS L2 | TUSHAR TRANSFORMERS L3 | M/S SUPER ENGINEERING TRADERS L4 | kumar engineering works L1 |
|---|---|---|---|---|---|---|---|
| 1.01 | Shifting, dragging and stacking of damaged T/fs to be repaired in the workshop at proper place in cutting yard & pre-checking/ physical inspection, testing of transformer before dismantling i.e. Megger Test (if OK) then HV Test (if OK) then No-Load & Load Losses Tests as per instructions of Junior Engineer in charge.
(i) 10/16 KVA | 200 | No. | 13,000 ₹15,340 | 18,000 ₹21,240 | 10,400 ₹12,272 Lowest | 11,600 ₹13,688 |
| 1.02 | (ii) 25 KVA | 2,000 | No. | 1,90,000 ₹2,24,200 Lowest | 2,60,000 ₹3,06,800 | 3,38,000 ₹3,98,840 | 1,94,000 ₹2,28,920 |
| 1.03 | (iii) 63 KVA | 1,500 | No. | 1,42,500 ₹1,68,150 Lowest | 1,95,000 ₹2,30,100 | 2,64,000 ₹3,11,520 | 1,47,000 ₹1,73,460 |
| 1.04 | (iv) 100 KVA | 1,500 | No. | 1,57,500 ₹1,85,850 | 2,10,000 ₹2,47,800 | 2,71,500 ₹3,20,370 | 1,47,000 ₹1,73,460 Lowest |
| 2.01 | Cutting of sealed T/fs top cover/ opening of nut and bolt of damaged t/f cover plate, de- tanking of core coil assembly dismantling of HV&LV Coils and other accessories, draining of T/f oil in sump well and weighing of scraps and shifting of all scrap to the store of JE in charge.
(i) 10/16 KVA | 200 | No. | 21,000 ₹24,780 | 18,000 ₹21,240 | 11,800 ₹13,924 Lowest | 12,000 ₹14,160 |
| 2.02 | (ii) 25 KVA | 2,000 | No. | 3,90,000 ₹4,60,200 | 2,50,000 ₹2,95,000 Lowest | 4,06,000 ₹4,79,080 | 3,00,000 ₹3,54,000 |
| 2.03 | (iii) 63 KVA | 1,500 | No. | 3,00,000 ₹3,54,000 | 1,95,000 ₹2,30,100 Lowest | 3,15,000 ₹3,71,700 | 2,55,000 ₹3,00,900 |
| 2.04 | (iv) 100 KVA | 1,500 | No. | 3,00,000 ₹3,54,000 | 2,10,000 ₹2,47,800 Lowest | 3,22,500 ₹3,80,550 | 2,70,000 ₹3,18,600 |
| 3.01 | Dismantling of core stamping and its cleaning of dust and dirt.
(i) 10/16 KVA | 200 | No. | 11,000 ₹12,980 | 18,000 ₹21,240 | 10,000 ₹11,800 | 9,600 ₹11,328 Lowest |
| 3.02 | (ii) 25 KVA | 2,000 | No. | 1,60,000 ₹1,88,800 Lowest | 2,50,000 ₹2,95,000 | 3,60,000 ₹4,24,800 | 1,70,000 ₹2,00,600 |
Tender Value
₹1 Cr
EMD Value
₹1 L
Closing Date
26 Dec 2020, 2:00 pmClosed
SE,EWC,Meerut
Room No 120, Urja Bhawan, PVVNL, Meerut.
FOR REPAIRING OF 10 KVA to 100 KVA DAMAGED T/F AT C.T.R. WORKSHOP, MURADNAGAR AND GHAZIABAD
2020_PVVNL_534423_1
T.No.61/EWC-MRT/2020-21
Open Tender
Electrical Works
Lump-sum
365 days
Meerut
As per tender Condition
3 documents required · 3 mandatory
₹3,540
Pay on A/C of EE,EWD
₹1 L
12 Jan 2021
1 Dec 2020
26 Dec 2020
1 Dec 2020
26 Dec 2020
1 Dec 2020
Shifting, dragging and stacking of damaged T/fs to be repaired in the workshop at proper place in cutting yard & pre-checking/ physical inspection, testing of transformer before dismantling i.e. Megger Test (if OK) then HV Test (if OK) then No-Load & Load Losses Tests as per instructions of Junior Engineer in charge. (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
Cutting of sealed T/fs top cover/ opening of nut and bolt of damaged t/f cover plate, de- tanking of core coil assembly dismantling of HV&LV Coils and other accessories, draining of T/f oil in sump well and weighing of scraps and shifting of all scrap to the store of JE in charge. (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
Dismantling of core stamping and its cleaning of dust and dirt. (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
Assembly of core coils and fitting of other accessories requiring replacement such as press board support spacers and tapping etc. and also cutting of insulation required for coil assembly. (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
Dragging of T/f Tank to washing Zone its cleaning by jet pump and washing by caustic soda shifting to open space for drying Providing primer of red oxide on the inner and outer side of tank and painting inner side of T/fs including core channel and tie rod / core rods with heat proof zinc chromate paint and out side with two coats of synthetic grey enamel paint. The paint should be of Asian/Nerolec/Burger/ Dulux/British make only. Writing of PUC/ Unique No. of transformer readable paint color with the help of stencils design. (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
Making of new HV coil from new wire / strip as per design of respective T/F (Complete Job) (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
Making of new LV coil from new wire / strip as per design of respective T/F (Complete Job) (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
Complete the core and coil assembly(CCA) by fitting HV & LV coils required insulating material and shifting it to oven for de-moisture (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
Tanking of the complete core and coil assembly (CCA) in to the painted tank safely, filling of reclaimed / centrifuged/ fresh oil fitting of all accessories. (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
Welding/ Tightening of nut and bolts of top cover of repaired T/f by electric welding filling Gap etc. properly including denting of tank if necessary and welding of MS plate 100x50x3 mm thick on the out side of the T/Fs contain unique no., capacity, name of the workshop etc. at proper place . (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
Dragging the Repaired T/f to the testing zone for final testing with necessary record and after testing it should be re dragged / stacked at despatch area. (i) 10/16 KVA
(ii) 25 KVA
(iii) 63 KVA
(iv) 100 KVA
General Cleaning of T&P / Machinery and stacking of material at suitable place
General clearness of store testing room, workshop floor, oven area, generator room, in cutting area, tanking area, assembly area, painting area by wiping, booming and wooden dust properly to keep floor clean by engaging proper man power for cleaning works. As required for cleaning works
DURGA ELECTRICALS
TUSHAR TRANSFORMERS
M/S SUPER ENGINEERING TRADERS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .