Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAccepted-Finance | ₹3.6 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹2.8 Cr−₹81.8 L (22.7%)Accepted-Finance | ₹2.8 Cr−₹81.8 L (22.7%) | L2 | Accepted-Finance Accepted |
| 3 | L3₹3.9 Cr+₹30.7 L (8.53%)Accepted-Finance 78 NEAR CHOPAL VILLAGE NIZAMPUR DISTT PANIPAT | PANIPAT | HARYANA | ₹3.9 Cr+₹30.7 L (8.53%) | L3 | Accepted-Finance Accepted |
| 4 | L4₹4.5 Cr+₹92.3 L (25.6%)Accepted-Finance | ₹4.5 Cr+₹92.3 L (25.6%) | L4 | Accepted-Finance Accepted |
Tender Value
₹5.3 Cr
EMD Value
₹10.7 L
Closing Date
5 Aug 2026, 3:00 pmClosed
Executive Engineer PWD Division M-111 New Delhi
Executive Engineer PWD Division M-111 R R Line Ring Road New Delhi-110010
Providing and Fixing of M.S. Grill at various roads under Sub Division WR-12, Division West Road-1, New Delhi during 2025-2026).
2026_PWD_296125_1
23/SE/WMC/PWD/2026-27 (R-1) 20/EE/PWD/WR-1/2026-27 (R-1)
Open Tender
Civil Works
Percentage
120 days
Under WR-12
Please refer Tender documents.
14 documents required · 14 mandatory
₹0
₹10.7 L
14 Aug 2026
29 Jul 2026
5 Aug 2026
29 Jul 2026
5 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. | |||||
| 1.01 | All kinds of soil | 2,990 | Each | 82 | ₹2,45,180 |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.01 | 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size). | 363 | Cum | 7,878.5 | ₹28,59,895.5 |
| 3Centering and shuttering including strutting, propping etc. and removal of form work for : | |||||
| 3.01 | Foundations, footings, bases for columns | 3,229 | Sqm | 392.15 | ₹12,66,252.35 |
| 4Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. | |||||
| 4.01 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 2,77,051 | Kg | 172.6 | ₹4,78,19,002.6 |
| 5Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : | |||||
| 5.01 | Two or more coats on new work | 10,872 | Sqm | 155.9 | ₹16,94,944.8 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.36 MB
BOQ_394172.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .