Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC | ₹9.7 L | L1 | Accepted-AOC LOWEST QUOTED RATES |
| 2 | L2₹9.9 L+₹29,686.17 (3.08%)Rejected-AOC ADARSH NAGAR ST NO 02 WARD NO 01 MALOUT MUKATSAR | LUDHIANA | PUNJAB | 141001 | ₹9.9 L+₹29,686.17 (3.08%) | L2 | Rejected-AOC HIGHEST QUOTED RATES |
| Sl No | Description | Qty | Unit | DEEPAK ENTERPRISES L1 | ARIHANT PIPES L2 |
|---|---|---|---|---|---|
| 1.00LAYING OF DWC UNDERGROUND PIPELINE FOR WATERCOURSE OF OUTLET PRD NO. 55000-L | |||||
| 1.01Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area | |||||
| 1.02 | Depth upto 1.5 mtr. | 1 | cum | 107 ₹107 Lowest | 110 ₹110 |
| 1.03 | Depth upto 1.5 to 2.25 mtr. | 1 | cum | 125 ₹125 Lowest | 130 ₹130 |
| 1.04 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth | 1 | cum | 212 ₹212 Lowest | 220 ₹220 |
| 1.05 | First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement. | 1 | cum | 7,550 ₹7,550 Lowest | 7,600 ₹7,600 |
| 1.06 | 10mm thick cement plaster 1.4 on sides walls | 1 | sqm | 192 ₹192 Lowest | 200 ₹200 |
| 1.07 | 10mm thick cement plaster 1:4 on bed and top. | 1 | sqm | 150 ₹150 Lowest | 175 ₹175 |
| 1.08 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | 1 | cum | 10,840 ₹10,840 Lowest | 11,000 ₹11,000 |
| 1.09 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 1 | cum | 5,767 ₹5,767 Lowest | 5,986 ₹5,986 |
Tender Value
₹21.4 L
EMD Value
₹42,897
Closing Date
20 Apr 2026, 11:00 amClosed
SH. TAJINDER SINGH DIVISIONAL ENGINEER
DIVISIONAL ENGINEER BDC-2 DIVISION PWRMDC DHOALWAHA NEHAR COLONY HOSHIARPUR
TENDER FOR LAYING OF DWC UNDERGROUND PIPELINE FOR WATERCOURSE OF OUTLET PRD NO. 55000-L OF IBBAN MINOR BY LAYING DWC U/G PIPELINE OF VILLAGE DHANDAL AND BALER KHANPUR, DISTT. KAPURTHALA
2026_WR_166060_1
NITNO.95/2026/BDC-2/PWRMDC/DT 01-04-2026
Open Tender
Civil Works
Item Rate
90 days
HOSHIARPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
₹42,897
Yes
11 Aug 2026
15 Apr 2026
20 Apr 2026
15 Apr 2026
20 Apr 2026
15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1LAYING OF DWC UNDERGROUND PIPELINE FOR WATERCOURSE OF OUTLET PRD NO. 55000-L | |||||
| 1.01 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area | - | - | - | - |
| 1.02 | Depth upto 1.5 mtr. | - | cum | - | - |
| 1.03 | Depth upto 1.5 to 2.25 mtr. | - | cum | - | - |
| 1.04 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth | - | cum | - | - |
| 1.05 | First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement. | - | cum | - | - |
| 1.06 | 10mm thick cement plaster 1.4 on sides walls | - | sqm | - | - |
| 1.07 | 10mm thick cement plaster 1:4 on bed and top. | - | sqm | - | - |
| 1.08 | Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement | - | cum | - | - |
| 1.09 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_336993.xls
BOQ • 0.25 MB
NIT.pdf
Tender Documents • 0.32 MB
DNIT.pdf
Tender Documents • 0.99 MB
95.pdf
PDF • 0.49 MB
95.pdf
PDF • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .