| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC PASCHIM BHAGABANPORE DARUA CONTAI PURBA MEDINIPUR 721401 | PURBA MEDINIPUR | PURBA MEDINIPUR | WEST BENGAL | 721401 | ₹2.1 Cr | L1 | Accepted-AOC Being L1 bidder |
| 2 | L2₹2.1 Cr+₹4.9 L (2.37%)Rejected-Finance | ₹2.1 Cr+₹4.9 L (2.37%) | L2 | Rejected-Finance Not, Being L1 bidder |
| 3 | L3₹2.1 Cr+₹8.3 L (4.01%)Rejected-Finance KACHERY ROAD BALASORE 756001 ODISHA | BALESHWAR | ODISHA | 756001 | ₹2.1 Cr+₹8.3 L (4.01%) | L3 | Rejected-Finance Not, Being L1 bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical Declared Unenlisted due to change in consitution wef 04 Aug 2025 remarks in WLR for the QE Dec 2025 issued by HQ CEEC, hence, not recommended. |
| Sl No | Description | Qty | Unit | R.B.Construction L3 | CMRGS Infrastructure Projects Ltd L2 | RANA ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00SCHEDULE 'A' SECTION-I (BUILDING WORKS) as under is not prepriced by MES and Estimated cost indicates 0.00 under Col-5 signifies this fact only | ||||||
| 1.01 | Extn of PP Building by new construction (Single storey) complete all as specified and shown on drawings. | 1 | Each Block | 1,63,00,000 ₹1,63,00,000 | 1,70,00,000 ₹1,70,00,000 | 1,55,00,000 ₹1,55,00,000 Lowest |
| 2.00Schedule 'A' Section-II to Section-VIII as under Serial No. 2.01 to 2.07 are prepriced by MES. | ||||||
| 2.01 | Lump sum price worked out by the Contractor for “Site Clearance/Development, Excavation and Earth Work” as listed in Schedule ‘A’ Section-II | 1 | Lump Sum | 27,00,000 ₹27,00,000 | 17,72,000 ₹17,72,000 Lowest | 24,44,000 ₹24,44,000 |
| 2.02 | Lump sum price worked out by the Contractor for “Internal Water Supply” as listed in Schedule ‘A’ Section-III | 1 | Lump Sum | 65,000 ₹65,000 | 53,500 ₹53,500 Lowest | 66,300 ₹66,300 |
| 2.03 | Lump sum price worked out by the Contractor for “External Water Supply” as listed in Schedule ‘A’ Section-IV | 1 | Lump Sum | 32,000 ₹32,000 | 20,000 ₹20,000 Lowest | 33,300 ₹33,300 |
| 2.04 | Lump sum price worked out by the Contractor for “Internal Electrification” as listed in Schedule ‘A’ Section-V | 1 | Lump Sum | 5,35,000 ₹5,35,000 | 4,99,000 ₹4,99,000 | 4,15,700 ₹4,15,700 Lowest |
| 2.05 | Lump sum price worked out by the Contractor for “External Electrification” as listed in Schedule ‘A’ Section-VI | 1 | Lump Sum | 5,25,000 ₹5,25,000 | 3,65,000 ₹3,65,000 Lowest | 4,59,000 ₹4,59,000 |
| 2.06 | Lump sum price worked out by the Contractor for “Sewage Disposal” as listed in Schedule ‘A’ Section-VII | 1 | Lump Sum | 46,250 ₹46,250 | 23,000 ₹23,000 Lowest | 37,000 ₹37,000 |
| 2.07 | Lump sum price worked out by the Contractor for “Air Conditioning” as listed in Schedule ‘A’ Section-VIII | 1 | Lump Sum | 4,00,000 ₹4,00,000 Lowest | 4,56,000 ₹4,56,000 | 4,80,000 ₹4,80,000 |
Tender Value
₹2.5 Cr
EMD Value
₹3.2 L
Closing Date
9 May 2026, 6:00 pmClosed
Chief Engineer (R and D) Delhi
HQ Chief Engineer R and D Delhi, Probyn Road, Timarpur, New Delhi- 110054
EXTENSION OF PP BUILDING FOR AUGMENTATION OF TECHNICAL FACILITY AT ITR CHANDIPUR (BLDG No. 3) UNDER GE (I) R and D CHANDIPUR.
2025_MES_742050_2
CE RnD/DLI-31/CHANDI/2025-26
Open Tender
Civil Works
Lump-sum
270 days
CHANDIPUR
As per tender documents
8 documents required · 8 mandatory
₹2,000
GE (I) (RnD) Chandipur
₹3.2 L
Yes
11 Aug 2026
24 Apr 2026
16 May 2026
24 Apr 2026
9 May 2026
1 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | SCHEDULE 'A' SECTION-I (BUILDING WORKS) as under is not prepriced by MES and Estimated cost indicates 0.00 under Col-5 signifies this fact only | - | - | - | - |
| 1.01 | Extn of PP Building by new construction (Single storey) complete all as specified and shown on drawings. | - | Each Block | - | - |
| - | Schedule 'A' Section-II to Section-VIII as under Serial No. 2.01 to 2.07 are prepriced by MES. | - | - | - | - |
| 2.01 | Lump sum price worked out by the Contractor for “Site Clearance/Development, Excavation and Earth Work” as listed in Schedule ‘A’ Section-II | - | Lump Sum | - | - |
| 2.02 | Lump sum price worked out by the Contractor for “Internal Water Supply” as listed in Schedule ‘A’ Section-III | - | Lump Sum | - | - |
| 2.03 | Lump sum price worked out by the Contractor for “External Water Supply” as listed in Schedule ‘A’ Section-IV | - | Lump Sum | - | - |
| 2.04 | Lump sum price worked out by the Contractor for “Internal Electrification” as listed in Schedule ‘A’ Section-V | - | Lump Sum | - | - |
| 2.05 | Lump sum price worked out by the Contractor for “External Electrification” as listed in Schedule ‘A’ Section-VI | - | Lump Sum | - | - |
| 2.06 | Lump sum price worked out by the Contractor for “Sewage Disposal” as listed in Schedule ‘A’ Section-VII | - | Lump Sum | - | - |
| 2.07 | Lump sum price worked out by the Contractor for “Air Conditioning” as listed in Schedule ‘A’ Section-VIII | - | Lump Sum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
TENDERMERGED.pdf
Tender Documents • 6.04 MB
BOQ_853270.xls
BOQ • 0.31 MB
DRGS.pdf
Additional Documents • 20.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .