| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.1 CrAdmitted-Finance | -13.78% | ₹14.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹15.8 Cr+₹1.7 Cr (12.4%)Admitted-Finance | -3.13% | ₹15.8 Cr+₹1.7 Cr (12.4%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee 00 GIRDHAR GARDEN KE SAMNE KHARI PHATAK ROAD VIDISHA VIDISHA MADHYA PRADESH 464001 | VIDISHA | MADHYA PRADESH | 464001 | - | - | - | Not Admitted-Fee Others-EMD/Fee/RISL/ not Received |
| 4 | Not Admitted-Fee | - | - | - | Not Admitted-Fee Others-EMD not Received |
Tender Value
₹16.3 Cr
EMD Value
₹32.6 L
Closing Date
16 Mar 2026, 6:00 pmClosed
ACE PWD ZONE KOTA
ACE PWD ZONE KOTA
Remaining construction work of Chhipabarod to Gugor via Chhabra (MDR-264) in district Baran
2026_CEPWD_539287_2
ACE PWD ZONE KOTA NITNO-45/2025-26
Open Tender
Civil Works
Percentage
300 days
BARAN
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
10000 EE PWD DIV. CHHABRA
₹32.6 L
Yes
ACE PWD ZONE KOTA
23 Mar 2026
23 Feb 2026
18 Mar 2026
23 Feb 2026
16 Mar 2026
23 Feb 2026
6 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scarifying, including picking up scarified Material and stacking of old serviceable Material within a lead of 1000 meter [MoRTH Specification: Clause 202 & 305.4.3]. Top bituminous surface of surface dressing or SDBC or premix carpet with all lift and lead upto 1000m for reusable Materials. | 0.09 | Per sqm | - | - |
| 2 | Construction of sub-grade and earthen shoulders with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to require slope and compacted by vibratory roller 8-10 tonne to meet requirement of Table 300-2 as per MoRTH specification : Clause No. 305. | 15,045.13 | Per Cum | - | - |
| 3 | Earthwork in excavation for roadway in soil, including stacking / disposal of surplus Material exclusive of compensation of earth (MoRTH specification : clause 301 to 305). By Hydraulic Excavator CK-90 of 0.9 cum bucket capacity and tipper with disposal upto 1000 mtrs. | 2,443.51 | Per Cum | - | - |
| 4 | Compaction of original ground with maximum of six passes of 8-10 tonnes power roller including filling depression occurring during rolling (MoRTH specification : clause 305.3.4) | 5,430 | Per Sqm | - | - |
| 5 | Providing, laying and spreading and compacting specified graded crushed stone in sub-base course including premixing the Material at OMC in mechanical mixer (Pug mill), carriage of mixed Material, laying in uniform layers with Motor Grader, F.E. Loader, on a prepared surface and compacting with Vibratory Compactor to achieve the desired density including all Material, labour, machinery, lighting barricading and maintenance of Driversion complete. (MoRTH specification clause 401). with all lead & lift | 4,746.13 | Per Cum | - | - |
| 6 | Providing, laying and spreading of granular sub-base by providing coarse graded Material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRTH Specification : clause No. 401. Grading-III | 10,478 | Per Cum | - | - |
| 7 | Providing, laying, spreading and compacting crushed graded stone aggregate as per Table 400-10 & 400.11 to Wet Mix Macadam specifications including premixing the Material with water to OMC in mechanical mixer (Pug mill) as per design mix, carriage of mixed Material by tipper to site laying in uniform layers, with motor grader/F.E. loader/Paver Finisher, in sub-base/base course on a well prepared under-base and compacting with Vibratory Roller to achieve the desired density including lighting, guarding, barricading and maintenance of Driversion etc. (MoRTH specification : Clause 406). with all lead & lift | 6,728.25 | Per Cum | - | - |
| 8 | Providing and applying primer coat over prepared surface of granular base with bitumen emulsion as per IS:8887 & manufacturer’s specifications @7.50 kg/10 sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the Material uniformly at specified rates and temperatures (including cleaning of road surface) as per MoRTH specification : Cl. 502, 112 | 51,090 | Per Sqm | - | - |
| 9 | Providing and applying tack coat on the prepared surface, with bitumen emulsion as per IS:8887 & manufacturer’s specifications @0.275 kg/sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the Material uniformly at specified rates and temperatures (including cleaning of road surface) as per MoRTH specification Cl. 502, 112. | 46,750 | Per Sqm | - | - |
| 10 | Providing and applying tack coat on the prepared surface, with bitumen emulsion as per IS:8887 & manufacturer’s specifications @0.225 kg/sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the Material uniformly at specified rates and temperatures (including cleaning of road surface) as per MoRTH specification Cl. 502, 112. | 86,125 | Per Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.61 MB
Tendernotice_2.pdf
PDF • 0.05 MB
Tendernotice_3.pdf
PDF • 1.39 MB
Tendernotice_4.pdf
PDF • 11.37 MB
POST-QUALIFICATION-02.pdf
Tender Documents • 4.69 MB
BOQ_961559.xls
BOQ • 0.32 MB
CERTIFICATE-02.pdf
Tender Documents • 0.20 MB
RATE-ANALYSIS-02.rar
Tender Documents • 0.36 MB
TENDER-DOCUMENT-02.pdf
Tender Documents • 1.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .