| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC | ₹3.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.9 LRejected-AOC | ₹3.9 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | GOLD CONSTRUCTION L2 | SURYA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 868 | sqm | 25.7 ₹22,307.6 | 23.1 ₹20,050.8 Lowest |
| 2.00 | Providing and laying 50 mm compacted thick Dense Bituminous Macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications. | 3.6 | cum | 10,256 ₹36,921.6 | 10,253.4 ₹36,912.24 Lowest |
| 3.00 | Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 / VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 26.1 | cum | 10,552 ₹2,75,407.2 | 10,549.4 ₹2,75,339.34 Lowest |
| 4.00 | ADD GST 18% | 1 | Nos | 60,234.55 ₹60,234.55 | 59,814.42 ₹59,814.42 Lowest |
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
3 Jun 2025, 3:00 pmClosed
Commissioner
Tiruvannamalai City Municipal Corporation
Relaying of BT Surface at ARUNAGIRI PURAM 2 STREET (040038R822) in Tiruvannamalai City Municipal Corporation.
2025_MAWS_562757_4
133312025/E1
Open Tender
Civil Works
Works
60 days
Tiruvannamalai City Municipal Corporation
Places Refer Tender Document
2 documents required · 2 mandatory
₹0
₹4,000
25 Aug 2026
29 May 2025
3 Jun 2025
29 May 2025
3 Jun 2025
29 May 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].