| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.1 LAccepted-AOC HARDAHA BALUWA VARANASI CHANDAULE | ₹5.1 L | L-1 | Accepted-AOC AOC |
| 2 | L-2₹5.5 LRejected-Finance | ₹5.5 L | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹5.7 LRejected-Finance | ₹5.7 L | L-3 | Rejected-Finance L-3 |
| Sl No | Description | Qty | Unit | M/S Harendri Devi L2 | M/S SHIV CONSTRUCTION L1 | RANA ASSOCIATES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation i/c proper disposal, initial lead and lift. | 56 | Cum | 200 ₹11,200 | 39 ₹2,184 | 100 ₹5,600 |
| 2.00 | Repairing of double brick lining in 1:4 cement mortar including all cost of material, labour and T&P etc. complete. | 240 | Sqm | 1,000 ₹2.4 L | 750 ₹1.8 L | 300 ₹72,000 |
| 3.00 | Providing Brick work in 1 :4 Cement Mortar i/c cost of all cost of labour, material, T&P etc for proper completion of work. | 33.85 | Cum | 5,500 ₹1.9 L | 5,220 ₹1.8 L | 6,500 ₹2.2 L |
| 4.00 | P/L cement Struck deep pointing in 1:2 cement sand mortar i/c all cost of material, labour and T&P etc. complete. | 300 | Sqm | 120 ₹36,000 | 92 ₹27,600 | 300 ₹90,000 |
| 5.00 | Providing & Laying C.C.1:2:4 with cement,sand and stone grit of size 10 to 25 mm per cum | 7.5 | Cum | 3,000 ₹22,500 | 6,000 ₹45,000 | 7,200 ₹54,000 |
| 6.00 | Providing & laying C.C. 1:3:6 with cement,sand and stone grit of size 25 to 37.25 mm per cum | 13.39 | Cum | 3,500 ₹46,865 | 5,400 ₹72,306 | 7,000 ₹93,730 |
| 7.00 | Silt clearance with slush, lehal and cartage upto 1.0 Km including lift upto 1.50 mt. and lead upto 6 mt. by JCB. Including cost of driver/assistant driver, POL , maintenance of machine, contractor profit, taxes etc including leveling & dressing . | 150 | Cum | 50 ₹7,500 | 65 ₹9,750 | 200 ₹30,000 |
Updated dates
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
10 Feb 2026, 1:00 pmClosed
EE BDGC BSR
EE BDGC BSR
Restoration and protection work Sidhpeeth of right bank from km 24.400 to km 24.480 of Baral Drain
2026_UPIDC_1110086_4
15/EE/2025-26
Open Tender
Civil Works
30 days
Bulandshahr
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹12,000
Yes
22 May 2026
28 Jan 2026
10 Feb 2026
28 Jan 2026
10 Feb 2026
28 Jan 2026
Earth work in excavation in foundation i/c proper disposal, initial lead and lift.
Repairing of double brick lining in 1:4 cement mortar including all cost of material, labour and T&P etc. complete.
Providing Brick work in 1 :4 Cement Mortar i/c cost of all cost of labour, material, T&P etc for proper completion of work.
P/L cement Struck deep pointing in 1:2 cement sand mortar i/c all cost of material, labour and T&P etc. complete.
Providing & Laying C.C.1:2:4 with cement,sand and stone grit of size 10 to 25 mm per cum
Providing & laying C.C. 1:3:6 with cement,sand and stone grit of size 25 to 37.25 mm per cum
Silt clearance with slush, lehal and cartage upto 1.0 Km including lift upto 1.50 mt. and lead upto 6 mt. by JCB. Including cost of driver/assistant driver, POL , maintenance of machine, contractor profit, taxes etc including leveling & dressing .
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.27 MB
BOQ_2050029.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid