Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.6 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹34.6 L+₹1.0 L (3.01%)Rejected-Finance 28 11 DHAVJI ROAD NEAR OUR LADY OF MOUNT MARY CHURCH ELLA OLD GOA 403402 | NORTH GOA | GOA | 403402 | L2 | Rejected-Finance Second Lowest | |
| 3 | Rejected-Technical | - | Rejected-Technical Not fulfil as per Bid Condition |
Tender Value
₹33.0 L
EMD Value
₹82,416
Closing Date
10 Aug 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Archaeologist
O/o Superintending Archaeologist, Archaeological Survey of India, Goa Circle, Old Goa, Goa -403 402
Re Tender Minor Civil and Electric Work (Conservation of Ancient Monument) Conservation to Se Cathedral Church at Old Goa (Repairs to the wooden members) (Revised estimate)
2024_ASI_818530_1
18/2024-25/Goa Circle/Old Goa
Open Tender
Civil Works
Works
90 days
Old Goa
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹82,416
Yes
O/o Superintending Archaeologist
21 Aug 2024
27 Jul 2024
12 Aug 2024
27 Jul 2024
10 Aug 2024
27 Jul 2024
27 Jul 2024 - 10 Aug 2024
2 Aug 2024
Amount
Dismantling the dilapidated and worn out pavement of chequered tiles alongwith the old bed concrete and soling, including cost of disposing the same away from the monument premises, etc. complete as directed by site incharge.
Earthwork excavation including side cutting and bottom leveling for the foundation for laying laterite stone pavement including cutting, carrying earth etc. complete including cost of disposing of unwanted excavated material away from the monument premises as directed by site incharge
Providing and laying rubble soling in foundation by using hard laterite stone including cost of watering, ramming and consolidating, etc. complete as directed by site incharge
Providing and laying C. C. 1:3:6 (1 cement: 3 coarse sand: 6 basaltic or granitic aggregate) in foundation including carrying materials, mixing, compacting curing, etc. complete as directed by site incharge
Laying laterite stone flooring by using stone size: 0.35 x 0.25 x 0.20 m in CM 1:3 (1 cement: 3 sand) including laying, proper dressing of stone, lifting, carrying materials, Curing and clean the work site after completion of work etc. complete as directed by site incharge
Pointing to the joints of the laterite stone flooring in Lime mortar (1:1:1) including preparing lime mortar, mixing, carrying materials, curing and clean the work site after completion of work etc. complete as directed by site incharge
Preparing & supplying the railing (railing should supply at Old Goa church complex) of height 0.90 metre by using vertical 20mm square bars @ 12 cm c/c and adjoining horizontally MS flat patti of size: 40 x 5 mm at upper and bottom side, preparing railing, fabrication, welding, carrying, lifting, including all charges, etc. complete as directed by site incharge (sample of Railing must be approved before supply)
Fixing square bar railing in Old Goa Church Complex by using Cement concrete (1:3:6), inserting and fixing the railing, carrying, lifting, including all charges, etc. complete as directed by site incharge.
Chandrashekar S Yalwar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .