Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.6 LAccepted-AOC 76 58 A1 KAMARAJ NAGAR SALEM CAMP METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 1 | Accepted-AOC L1 | |
| 2 | 2₹19.4 L+₹32,844 (1.72%)Rejected-AOC H 6 HOUSING BOARD UNIT MATHAVANKUTTAI P O METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹11,300
Closing Date
17 Apr 2024, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM AOH 2024 25 Unit III Renewal of various types of heating elements in APH A and B Sides and other related works
2024_EB_424711_1
CE/MTPS-I/SE/M-I/BM/OT.406 / 2023-24
Open Tender
Power/Energy Projects/Products
Works
25 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹11,300
Yes
23 Jan 2025
14 Feb 2024
18 Apr 2024
14 Feb 2024
17 Apr 2024
14 Feb 2024
Amount
Charges for removal of sacrificing heating elements.
Charges for renewal of sacrificing heating elements (200 mm height) Loading and transporting from central stores to boiler area, unloading and lifting the new Sacrificing heating elements.
Charges for removal of Hot end heating elements (650 mm height) from APH and lowering the heating elements from 20 mtr height to ground floor and devoluted to stores.
Charges for renewal of HOT end heating elements (650 mm height) loading, transporting from central stores to boiler area, unloading and lifting the Hot end baskets.
Charges for removal of Intermediate heating elements –850 mm height.
Charges for renewal of intermediate end heating elements.-850 mm height
Loading, transporting the New cold end baskets to boiler area, unloading and lifting the new baskets (300 mm height) from ground floor to 16 mtr floor and lowering the eroded cold end baskets from 16 mtr level to ground floor and devoluted to stores
Renewal of cold end support frame at both inboard and out board.
Cutting gas
Consumables and T & Ps for item S.No.1 to 8.
R K ENGINEERING CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .