| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.2 LAccepted-Finance | ₹16.2 L | 1 | Accepted-Finance lowest bid by sree durga enterprises hencee accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical NOT ADMITTED |
| Sl No | Description | Qty | Unit | R.SIVA KUMAR L2 | SREE DURGA ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Construction of Compound wall at Community Hall and Multi Purpose Hall (Outer) in Thervoy Panchayat | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 81.06 | cu.m | 350 ₹28,371 | 263.5 ₹21,359 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 9.9 | cu.m | 2,500 ₹24,750 | 2,311.5 ₹22,884 |
| 4.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 9.9 | cu.m | 6,500 ₹64,350 | 6,146.5 ₹60,850 |
| 5.00 | Supply and Fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc,..completed.. | 2.26 | MT | 92,016.5 ₹2.1 L | 92,016.5 ₹2.1 L |
| 6.00Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | |||||
| 7.00 | Upto Basement | 22.26 | sq.m | 750 ₹16,695 | 547.5 ₹12,187 |
| 8.00 | Above Basement | 150.26 | sq.m | 1,100 ₹1.7 L | 1,094 ₹1.6 L |
| 9.00 | RCC 1:1.5:3 Mix (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 28.16 | cu.m | 12,000 ₹3.4 L | 9,910 ₹2.8 L |
| 10.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 49.22 | cu.m | 6,500 ₹3.2 L | 6,290 ₹3.1 L |
Tender Value
₹16.4 L
EMD Value
₹16,350
Closing Date
25 Feb 2026, 3:00 pmClosed
BDO vp
BDO,Gummidipoondi
CONSTRUCTION OF COMPOUND WALL IN THERVOY PANCHAYAT
2026_RDTN_663201_1
RC/440/2025/A6
Open Tender
Civil Works - Others
60 days
BDO, Gummidipoondi
RFFER TENDER DOC
4 documents required · 4 mandatory
₹0
₹16,350
Yes
28 Feb 2026
21 Feb 2026
25 Feb 2026
21 Feb 2026
25 Feb 2026
21 Feb 2026
Construction of Compound wall at Community Hall and Multi Purpose Hall (Outer) in Thervoy Panchayat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Supply and Fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc,..completed..
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).
Upto Basement
Above Basement
RCC 1:1.5:3 Mix (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Provision for MAIN GATE
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_796249.xls
BOQ • 0.32 MB
TENDERDOCUMENTCOMPOUNDWALL.pdf
Tender Documents • 0.59 MB
Download all tender documents and submit your bid