| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.8 Cr+₹8.8 L (5.20%)Rejected-AOC | ₹1.8 Cr+₹8.8 L (5.20%) | L-2 | Rejected-AOC L-2 |
| 3 | L-3₹1.8 Cr+₹14.8 L (8.75%)Rejected-AOC | ₹1.8 Cr+₹14.8 L (8.75%) | L-3 | Rejected-AOC L-3 |
| 4 | L-4₹1.9 Cr+₹23.8 L (14.1%)Rejected-AOC | ₹1.9 Cr+₹23.8 L (14.1%) | L-4 | Rejected-AOC L-4 |
| 5 | L-5₹2.1 Cr+₹37.5 L (22.2%)Rejected-AOC B 108A SECTOR 36 GREATER NOIDA DISTT G B NAGAR UP | GREATER NOIDA | GAUTAM BUDH NAGAR | UTTAR PRADESH | ₹2.1 Cr+₹37.5 L (22.2%) | L-5 | Rejected-AOC L-5 |
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
22 Sept 2020, 1:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER RAPTI NAHAR NIRMAN MANDAL 1 BALRAMPUR
As Per Tender Notice
2020_UPIDC_510194_1
04/S.E./2020-21
Open Tender
Civil Works - Canal
Item Rate
90 days
Balrampur
As Per Tender Notice
2 documents required · 2 mandatory
₹2,354
Online
₹4.2 L
Yes
Balrampur
2 Nov 2020
14 Sept 2020
22 Sept 2020
14 Sept 2020
22 Sept 2020
14 Sept 2020
17 Sept 2020
Amount
Earth work in embankment of diversion road/approach ramp; including all leads & lifts, all cost of labour's, T&P etc. with manual compaction and dressing to profile complete work.
Earth work in constructing channel section & making both bank, dowla, manually or by tractor where ever possible and applicable for scape of above 30 cumecs discharge; including hard clay, charry bajari above 5%, all lead and lift, labour, T & P etc. with manual compaction and dressing to profile complete work.
Providing & fixing sign board; including all complete work as per direction of engineer in charge..
Making temporary hutment for site store and site office purposes size 6.0x4.0m. Ukliptis hstrut, purlin of size 151 to 200 mm and chapper 10cm thick with bamboo frame and supply of parda with fresh materials & bamboo frame door; including all cost of material, labour, T&P etc. complete complete work as per direction of engineer-incharge.
Earth work in excavation foundation of masonary work in all type of soil on channels discharge above 10cumecs; including all leads & lifts and cost of all labour's T&P etc. as per direction of engineer in charge, complete work.
Laying C.C, A-40, M-10 in foundation with cement (OPC 43 Grade), coarse sand of Hamirpur, F.M ≥2.0 and Kabrai (Mahoba) hard stone ballast A40 (size 4.75 to 40mm gauge); including all lead & lift with mechanical mixing through batching plant, cost of all material, T&P, Labour etc. required for proper completion of work.
Laying C.C, A-40, M-15 P.C.C. with cement (OPC 43 Grade), coarse sand of Hamirpur, F.M ≥2.0 and Kabrai (Mahoba) hard stone ballast A20 (size 4.75 to 20mm gauge); including all lead & lift with mechanical mixing through batching plant & machinal vibration, cost of all material, T&P, Labour etc. required for proper completion of work.
Laying C.C, A-20, M-20 in R.C.C. with cement (OPC 43 Grade) coarse sand of Hamirpur F.M ≥2.0 and Kabrai (Mahoba) hard stone ballast A20 (size 4.75 to 20mm gauge); including all lead & lift with mechanical mixing through batching plant & machinal vibration, cost of all material, T&P, Labour etc. required for proper completion of work.
Laying R.C.C, A-20, M-25 in R.C.C. with cement (OPC-43 Grade) coarse sand of Hamirpur F.M ≥ 2.0 and Kabrai (Mahoba) hard stone ballast A20 (size 4.75 to 20mm gauge); including all lead & lift with mechanical mixing through batching plant & machinal vibration, cost of all material, T&P, Labour etc. required for proper completion of work.
Laying R.C.C. A-20mm M-30 in R.C.C. with cement (OPC-43 Grade) coarse sand of Hamirpur F.M ≥2.0 and Kabrai (Mahoba) hard stone ballast A20 (size 4.75 to 20mm gauge); including all lead & lift with mechanical mixing through batching plant & machanical vibration, cost of all material, T&P, Labour etc. required for proper completion of work.
Laying R.C.C A-10 M-30 in R.C.C. with cement (OPC-43 Grade) coarse sand of Hamirpur F.M ≥ 2.0 and Kabrai (Mahoba) hard stone ballast A20 (size 4.75 to 20mm gauge); including all lead & lift with mechanical mixing through batching plant & machanical vibration, cost of all material, T&P, Labour etc. required for proper completion of work.
Centering & Shuttering for C.C & R.C.C. work; including all cost of material, labour, T&P etc. with all lead & lift reqired for proper completion of work.
Supply and fixing tarpaper paper on wearing of pier's and abutments caps in two layer's; including all cost of material, labour, T&P etc. complete work.
Cutting, bending, binding and placing TMT steel reinforcement bar; including all cost of all material, binding wire, labours, T&P etc. but excluding cost of scafolding, required for proper compltion of work.
Supply & fixing 20mm thick joint filler bord as per direction of engineer in charge; including cost of all material, labour, T&P etc. required for proper complection of work.
Providing expansion joint in R.C.C slab; fabricated expansion joint of angle iron & M.S flate and joints filled with sealing compound as per drawing & direction of engineer in charge, with cost of all material, labour, T&P etc. required for proper completion of work.
Supply & arrangement of borring for dewatering with 150 mmØ casing pipe for 12m long of 100mmØ M.S. pipe and stainar; including all cost of material, labour, T&P etc. required for proper completion of work.
Dewatering with all cost of power/POL machines, pump well, paint system & operator etc. with assembling and dismantling of equipment required; including all cost of material, labour, T&P etc. requaired for proper complection of work.
Earth work in back filling of foundation up to level as direction of engineer in charge, in all type of soil, including all lead & lift, all cost of material, labour, T&P etc. with manual compaction, complete work.
Supply & laying local sand backfilling in foundation below approach slab; including all cost of materials, labour, T&P etc. requaired for proper completion of work with manual compaction, comlete work.
Supply & Laying dry stone boulder 20 to 40 kg. weight, [Sankargrah ballast quarry]; including all cost of material, labour, T&P etc. as per direction of engineer in charge, complete work.
Dry brick on edge soling of first-class brick with prepration of sub grade and joints filled with local sand; including all cost of material, labour, T&P etc. requaired for completion of work..
First class brick work of half brick thick wall in 1:3 C:M with Hamirpur coarse sand of F.M. ≥ 2.0; including all cost of material, labour, T&P etc. required for proper completion of work.
Cement pointing in 1:2 C:M with chopan coarse sand FM ≥ 2.0, including all cost of material, labour, T&P etc. required for proper completion of work.
Supply & fixing wheel guard of R.C.C. post or hard stone 200 x 200 x 900 mm size; including all cost of material, labour, T&P etc. completion work.
Supply & fixing G.I. pipe medium weight railying of 4"Ø; including all cost of material, labour, T&P etc. completion work.
M/S BHOLU CONSTRUCTION COMPANY
SHIV KUMAR MALL
M/s Dhruv Singh Contractor
M/S VIRAT CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .