Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | ₹1.5 L | L1 | Accepted-AOC Lowest Quoted |
| 2 | L2₹1.5 L+₹5,928.47 (4.06%)Rejected-Finance | ₹1.5 L+₹5,928.47 (4.06%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹1.5 L+₹8,443.32 (5.79%)Rejected-Finance | ₹1.5 L+₹8,443.32 (5.79%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹1.6 L+₹9,859.94 (6.76%)Rejected-Finance | ₹1.6 L+₹9,859.94 (6.76%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹1.6 L+₹10,513.99 (7.20%)Rejected-Finance | ₹1.6 L+₹10,513.99 (7.20%) | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | P. GEORGE L4 | THANKAPPAN NAGARETHINAM L2 | D.RAVI KUMAR L8 | MANONMONY HENRY ALBERT JOSEPH L9 | SASI L6 | Robinson P L5 | KRISHNAKUMAR WORKS CONTRACTOR L1 | R. GEORGE THOMAS L7 | Wilson R L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Providing Horizontal SoakPit at Konnakuzhivilai Habitation in Nullivilai Village Panchayat of Thuckalay Panchayat Union under (SBM/2026-2027) | ||||||||||||
| 1.01 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 37.79 | cum | 208.39 ₹7,875.06 | 207.07 ₹7,825.18 | 224.21 ₹8,472.9 | 250 ₹9,447.5 | 211.02 ₹7,974.45 | 224 ₹8,464.96 | 195.2 ₹7,376.61 Lowest | 224.48 ₹8,483.1 | 205.75 ₹7,775.29 |
| 1.02 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 6.48 | cum | 4,468.42 ₹28,955.36 | 4,133.21 ₹26,783.2 | 4,807.79 ₹31,154.48 | 5,047 ₹32,704.56 | 4,524.98 ₹29,321.87 | 4,468 ₹28,952.64 | 4,185.61 ₹27,122.75 | 4,480.71 ₹29,035 | 4,106.7 ₹26,611.42 Lowest |
| 1.03 | Supplying errecting centering the soffits of CC works including cost conveyence and all labour charges etc., complete etc., complete as per standard specification | 41.55 | sq.m | 432.52 ₹17,971.21 | 429.79 ₹17,857.77 | 465.37 ₹19,336.12 | 520 ₹21,606 | 438 ₹18,198.9 | 432 ₹17,949.6 | 405.15 ₹16,833.98 Lowest | 465.92 ₹19,358.98 | 426.66 ₹17,727.72 |
| 1.04 | Cement concrete 1:3:6 mix using 20 mm metal including cost conveyence and all labour charges etc., complete etc., complete as per standard specification | 14.36 | cum | 4,788.41 ₹68,761.57 | 4,722.78 ₹67,819.12 | 5,132.1 ₹73,696.96 | 5,715 ₹82,067.4 | 4,849.02 ₹69,631.93 | 4,788 ₹68,755.68 | 4,485.35 ₹64,409.63 | 5,119.85 ₹73,521.05 | 3,916.38 ₹56,239.22 Lowest |
| 1.05 | Collection and supply of 40mm metal from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete as per standard specification | 2.1 | cum | 1,159.48 ₹2,434.91 | 1,152.14 ₹2,419.49 | 1,247.54 ₹2,619.83 | 1,394 ₹2,927.4 | 1,174.16 ₹2,465.74 | 1,158 ₹2,431.8 | 1,086.1 ₹2,280.81 Lowest | 1,249.01 ₹2,622.92 | 3,369.6 ₹7,076.16 |
| 1.06 | Collection and supply of 20mm metal from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete as per standard specification | 2.1 | cum | 1,581.73 ₹3,321.63 | 1,571.73 ₹3,300.63 | 1,701.54 ₹3,573.23 | 1,902 ₹3,994.2 | 1,601.76 ₹3,363.7 | 1,581 ₹3,320.1 | 1,481.62 ₹3,111.4 Lowest | 1,703.87 ₹3,578.13 | 3,432 ₹7,207.2 |
| 1.07 | Collection and supply of 10-12mm metal from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete as per standard specification | 2.1 | cum | 1,289.47 ₹2,707.89 | 1,281.32 ₹2,690.77 | 1,387.41 ₹2,913.56 | 1,550 ₹3,255 | 1,305.5 ₹2,741.55 | 1,289 ₹2,706.9 | 1,207.86 ₹2,536.51 Lowest | 1,389.04 ₹2,916.98 | 3,900 ₹8,190 |
| 2.05 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 23,765 ₹23,765 | 23,165 ₹23,165 | 25,518 ₹25,518 | 28,080 ₹28,080 | 24,066 ₹24,066 | 23,865 ₹23,865 | 22,261 ₹22,261 Lowest | 25,113 ₹25,113 | 23,549 ₹23,549 |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
18 Aug 2026, 3:00 pmClosed
Block Development Officer (V.Pts)
Thuckalay Panchayat Union at Kozhiporvilai
Providing Horizontal SoakPit at Konnakuzhivilai Habitation in Nullivilai Village Panchayat
2026_RDTN_688214_1
A9/100/2026_SBM_5
Open Tender
Civil Works
Works
45 days
Thuckalay Panchayat Union at Kozhiporvilai
As per tender document
2 documents required · 2 mandatory
₹0
₹2,000
16 Sept 2026
24 Jul 2026
18 Aug 2026
24 Jul 2026
18 Aug 2026
24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing Horizontal SoakPit at Konnakuzhivilai Habitation in Nullivilai Village Panchayat of Thuckalay Panchayat Union under (SBM/2026-2027) | |||||
| 1.01 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 37.79 | cum | 263.78 | ₹9,968.25 |
| 1.02 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 6.48 | cum | 5,265.23 | ₹34,118.69 |
| 1.03 | Supplying errecting centering the soffits of CC works including cost conveyence and all labour charges etc., complete etc., complete as per standard specification | 41.55 | sq.m | 547.5 | ₹22,748.63 |
| 1.04 | Cement concrete 1:3:6 mix using 20 mm metal including cost conveyence and all labour charges etc., complete etc., complete as per standard specification | 14.36 | cum | 6,016.28 | ₹86,393.78 |
| 1.05 | Collection and supply of 40mm metal from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete as per standard specification | 2.1 | cum | 1,467.7 | ₹3,082.17 |
| 1.06 | Collection and supply of 20mm metal from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete as per standard specification | 2.1 | cum | 2,002.2 | ₹4,204.62 |
| 1.07 | Collection and supply of 10-12mm metal from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete as per standard specification | 2.1 | cum | 1,632.25 | ₹3,427.73 |
| 2.05 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_827250.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_827250.xls
BOQ • 0.33 MB
TechnicalBid.pdf
Tender Documents • 0.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .