Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Tender Fee and EMD not submitted |
Tender Value
Refer Docs
EMD Value
₹3.5 L
Closing Date
12 Mar 2026, 4:00 pmClosed
EE, Doimukh Division, APPWD, Doimukh
O/o the EE, Doimukh Division, APPWD, Doimukh
Construction of Road from NH- 713A to Seeh Putu under Papum Pare A.P. SH Formation Cutting.
2026_PWDAP_3021_1
DD/2025-26/12
Open Tender
Civil Works
Item Rate
730 days
Doimukh
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
EE PWD Doimukh
₹3.5 L
13 Mar 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH:- Earthwork | |||||
| 1.01 | Excavation in Hilly Areas in Soil by Manual Means (Excavation in soil in Hilly Area by Manual Means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification Clause 1603.1) | 9,732.04 | Cum | - | - |
| 1.02 | Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) | 38,928.17 | Cum | - | - |
| 1.03 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) | 32,440.14 | Cum | - | - |
| 1.04 | Deduction | - | - | - | - |
| 1.05 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders. | 14,598.06 | Cum | - | - |
| 1.06 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock) | 9,732.04 | Cum | - | - |
| 2SH:- RCC Slab Culvert 2x2 mtr span ( 4 Nos) | |||||
| 2.01 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling the excavated earth to the extent required and utilised the remaining earth locally for road work.) Ordinary soil Manual Means upto 3 m depth (without de-watering) | 177.6 | Cum | - | - |
| 2.02 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) | 92.44 | Cum | - | - |
stage.html
html • 0.02 MB
finance_3221.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_3221.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 3.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .