| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-Finance | L1 | Accepted-Finance Due to lower rates | |
| 2 | L2₹5.0 L+₹45,109.52 (9.97%)Rejected-Finance | L2 | Rejected-Finance Due to higher rates | |
| 3 | L3₹5.1 L+₹58,018.52 (12.8%)Rejected-Finance HAMIRPUR ROAD UNA HIMACHAL PRADESH 177203 | UNA | HIMACHAL PRADESH | 177203 | L3 | Rejected-Finance Due to higher rates |
Tender Value
₹5.0 L
EMD Value
₹10,000
Closing Date
13 Jun 2022, 5:00 pmClosed
Executive Engineer, Nuh
Executive Engineer, Provincial Division, PWD BNR Branch, Nuh
Construction of boundary wall in campus of Bal Bhawan Building at Ferozepur Jhirka in Nuh District. (Balance works)
2022_HRY_224761_1
PWD/Nuh/Bal/Bhawan/FPJhirka
Open Tender
Civil Works - Buildings
Works
30 days
Nuh
As per bid document
3 documents required · 3 mandatory
₹500
Yes
₹10,000
Yes
Executive Engineer, Nuh
1 Jul 2022
7 Jun 2022
15 Jun 2022
7 Jun 2022
13 Jun 2022
7 Jun 2022
9 Jun 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a ead of 50 m. (HSR 4.14.1)
Filling available excavated earth (excluding rock) in trenches, cum plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. (HSR 4.32)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level:-1 :4: 8 ( 1 Cement : 4 coarse sand (zone-Ill) : 8 graded stone aggregate 40 mm nominal size) (HSR 6.1.6)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor four level, excluding the cost of centering, shuttering and finishing:- 1 :2:4 (1 Cement : 2 coarse sand (zone-Ill) : 4 graded stone aggregate 20 mm nominal size) (HSR 6.2.2)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement:- 1:1.5:3 (1 cement : 1.5 coarse sand(zone-111) : 3 graded stone aggregate 20 mm nominal size) (HSR 6.15.1)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1: 1.5:3 (1 cement : 1.5 coarse sand(zone-111) : 3 graded stone aggregate 20 mm nominal size). (HSR 6.16)
Centering and shuttering including strutting, propping etc. and removal of form for. (HSR 6.30)
Foundations, footings, bases of columns, etc. for mass concrete. (HSR 6.30.1)
Lintels, beams, plinth beams, girders, bressumers and cantilever. (HSR 6.30.5)
Providing and laying damp-proof course with cement concrete 1 :2:4 (1 cement : 2 coarse sand (zone-Ill): 4 graded stone aggregate 12.5mm nominal size) 25mm thick. (HSR 6.8.3)
Brick work with common burnt clay non modular bricks of class designation 7.5 in foundation and plinth in: Cement Mortar 1:4 (1 cement: 4 coarse sand). (HSR 7.21.1)
Brick work with common burnt clay non-modular bricks of class designation 7 .5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : Cement mortar 1:4 (1 cement: 4 coarse sand) (HSR 7.22.1)
12 mm cement plaster of mix : 1 :6 (1 cement: 6 fine sand). (HSR 11.5.3)
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface: Water thinnable cement primer. (HSR 11.67.1)
Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied@ 3.84 kg/10 sqm) (HSR 11.93.1)
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. Cold twisted bars (HSR 6.33.3)
Providing and laying of conglomerate floor 50mm thick cement concrete topping 1 :2:4. (HSR 10.7)
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level. Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, over1aps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. Cold twisted bars (HSR 6.34.3)
Parth Construction
SK Trading Co.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .