Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-AOC | ₹14.3 L | L1 | Accepted-AOC Low Rate Quoted |
| 2 | L2₹14.4 L+₹14,655.05 (1.03%)Rejected-Finance | ₹14.4 L+₹14,655.05 (1.03%) | L2 | Rejected-Finance High Rate Quoted |
| Sl No | Description | Qty | Unit | P Dhayalan L2 | J Sakthivel L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all clauses of soils and subsoils to full depth as may be directed ,exept in hard rock requring blasting but inclusive of shoring ,shuttering with initial lead and lift etc.,including levelling the sites complete | 39.6 | m3 | 140 ₹5,544 | 131.5 ₹5,207.4 Lowest |
| 2.00 | Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification | 297 | m3 | 400 ₹1,18,800 | 365 ₹1,08,405 Lowest |
| 3.00 | Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification | 85.58 | m3 | 5,430 ₹4,64,699.4 | 5,426.5 ₹4,64,399.87 Lowest |
| 4.00 | Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification | 92.24 | m3 | 6,740 ₹6,21,697.6 | 6,731.5 ₹6,20,913.56 Lowest |
| 5.00 | Provision for Bitumen Pad 12mm thick | 1 | Nos | 2,000 ₹2,000 | 1,500 ₹1,500 Lowest |
| 6.00 | GST 18% | 1 | No | 2,18,293.38 ₹2,18,293.38 | 2,16,076.65 ₹2,16,076.65 Lowest |
| 7.00 | LWF 1% | 1 | No | 12,127.41 ₹12,127.41 | 12,004.26 ₹12,004.26 Lowest |
Tender Value
₹14.3 L
EMD Value
₹14,300
Closing Date
26 Feb 2026, 5:00 pmClosed
BLOCK DEVELOPMENT OFFICER
BLOCK DEVELOPMENT OFFICE, CHEYYAR
Providing CC Road at Nadu Street in Eraiyur Panchayat in Cheyyar Block Under General Fund - 2025-26 Scheme
2026_RDTN_664911_1
EraiyurCCRoad
Open Tender
Civil Works
Lump-sum
90 days
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,300
27 Aug 2026
23 Feb 2026
26 Feb 2026
23 Feb 2026
26 Feb 2026
23 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all clauses of soils and subsoils to full depth as may be directed ,exept in hard rock requring blasting but inclusive of shoring ,shuttering with initial lead and lift etc.,including levelling the sites complete | 39.6 | m3 | - | - |
| 2 | Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification | 297 | m3 | - | - |
| 3 | Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification | 85.58 | m3 | - | - |
| 4 | Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification | 92.24 | m3 | - | - |
| 5 | Provision for Bitumen Pad 12mm thick | 1 | Nos | - | - |
| 6 | GST 18% | 1 | No | - | - |
| 7 | LWF 1% | 1 | No | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_798508.xls
BOQ • 0.34 MB
date.pdf
PDF • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .