Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.9 LAccepted-AOC NEW MUBARAKPUR DEVI STHAN DANAPUR CANTT PATNA BIHAR 801503 | PATNA | PATNA | BIHAR | 801503 | ₹40.9 L Quoted ₹41.5 L | L1 | Accepted-AOC LOWEST |
| 2 | L2₹43.3 L+₹1.8 L (4.28%)Rejected-Finance | ₹43.3 L+₹1.8 L (4.28%) | L2 | Rejected-Finance Bid is not lowest |
| 3 | L3₹43.4 L+₹1.8 L (4.44%)Rejected-Finance 1 SADHANA SOCIETY DEV BAUG DEVBAUG BHAVNAGAR GUJARAT 364001 | BHAVNAGAR | GUJARAT | 364001 | ₹43.4 L+₹1.8 L (4.44%) | L3 | Rejected-Finance Bid is not lowest |
| 4 | L4₹43.5 L+₹1.9 L (4.61%)Rejected-Finance | ₹43.5 L+₹1.9 L (4.61%) | L4 | Rejected-Finance Bid is not lowest |
| 5 | L5₹44.3 L+₹2.8 L (6.74%)Rejected-Finance MONIRAMPUR DASPARA P O BARRACKPORE | BARRACKPORE | NORTH 24 PARGANAS | WEST BENGAL | 743101 | ₹44.3 L+₹2.8 L (6.74%) | L5 | Rejected-Finance Bid is not lowest |
| Sl No | Description | Qty | Unit | MS JODHI PRASAD SINGH SONS L4 | Atish Builders LLP L6 | Supreme Builders L7 | MR ENTERPRISES L8 | shivansh builders L1 | ANSH VANSH CONSTRUCTION COMPANY L2 | M/S SHEO KUMAR SINGH AND SONS L10 | M/S RAJ INTERIORS L9 | M/S MODERN CONSTRUCTION L5 | M/s Krishna Construction Company L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick/Stone masnory work built in cement mortar including all quions, arches, pillars, etc complete all as specified and directed. | 66 | Cum | 605 ₹39,930 | 600 ₹39,600 | 850 ₹56,100 | 650 ₹42,900 | 600 ₹39,600 | 300 ₹19,800 Lowest | 630 ₹41,580 | 500 ₹33,000 | 615 ₹40,590 | 1,000 ₹66,000 |
| 2.00 | Demolition of cement concrete in ground floors and paving (un reinforced) n exc. 15 cm. thicknesses, below or above ground level complete all as specified and directed. | 1.5 | Cum | 655 ₹982.5 | 630 ₹945 | 800 ₹1,200 | 700 ₹1,050 | 640 ₹960 | 200 ₹300 Lowest | 670 ₹1,005 | 1,500 ₹2,250 | 660 ₹990 | 1,200 ₹1,800 |
| 3.00 | Demolition of reinforced cement concrete in roof or any descsription complete all as specified and directed. | 1.5 | Cum | 655 ₹982.5 | 650 ₹975 | 1,000 ₹1,500 | 650 ₹975 | 640 ₹960 | 200 ₹300 Lowest | 670 ₹1,005 | 1,000 ₹1,500 | 652 ₹978 | 1,500 ₹2,250 |
| 4.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 20.6 | Qtl | 530 ₹10,918 | 500 ₹10,300 | 500 ₹10,300 | 600 ₹12,360 | 500 ₹10,300 | 300 ₹6,180 Lowest | 550 ₹11,330 | 500 ₹10,300 | 525 ₹10,815 | 1,000 ₹20,600 |
| 5.00 | Boring holes 3.5m deep in soil for single under reamed piles and getting out and disposal of soil to a distance n.exc 50m (dia of pile 300mm) complete all as specified and directed. | 84 | Each | 815 ₹68,460 | 1,200 ₹1,00,800 | 1,500 ₹1,26,000 | 1,200 ₹1,00,800 | 800 ₹67,200 | 1,500 ₹1,26,000 | 1,230 ₹1,03,320 | 500 ₹42,000 Lowest | 810 ₹68,040 | 2,800 ₹2,35,200 |
| 6.00 | Excavation in trenches in soft/ loose soil not exc 1.5m wide and not exc 1.5m deep for foundation, pier holes etc n. exc 10 sqm on plan and getting out complete all as specified and directed. | 52.81 | Cum | 460 ₹24,292.6 | 500 ₹26,405 | 350 ₹18,483.5 | 500 ₹26,405 | 450 ₹23,764.5 | 255 ₹13,466.55 Lowest | 530 ₹27,989.3 | 500 ₹26,405 | 475 ₹25,084.75 | 600 ₹31,686 |
| 7.00 | M&L plain cement concrete 1:4:8 type D-2 using 40mm graded stone aggregate in foundation, filling and mass concrete complete all as specified and directed. | 12.92 | Cum | 5,135 ₹66,344.2 | 5,000 ₹64,600 | 4,500 ₹58,140 Lowest | 6,000 ₹77,520 | 5,000 ₹64,600 | 5,500 ₹71,060 | 5,500 ₹71,060 | 4,500 ₹58,140 Lowest | 5,260 ₹67,959.2 | 4,500 ₹58,140 Lowest |
| 8.00 | M&L for Mild steel TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips | 6,295 | Kg | 135 ₹8,49,825 | 125 ₹7,86,875 | 115 ₹7,23,925 | 145 ₹9,12,775 | 128 ₹8,05,760 | 110 ₹6,92,450 | 150 ₹9,44,250 | 100 ₹6,29,500 Lowest | 145 ₹9,12,775 | 120 ₹7,55,400 |
| 9.00 | All as per item above but 5mm dia and over in stirrups, spacers and binders complete. | 1,573.75 | Kg | 135 ₹2,12,456.25 | 125 ₹1,96,718.75 | 105 ₹1,65,243.75 | 145 ₹2,28,193.75 | 130 ₹2,04,587.5 | 110 ₹1,73,112.5 | 150 ₹2,36,062.5 | 95 ₹1,49,506.25 Lowest | 145 ₹2,28,193.75 | 160 ₹2,51,800 |
| 10.00 | M&L reinforced cement concrete M-25 design mix using 20mm graded stone aggregate as in foundations, footing, foundation beams, plinth beams, bases for columns, pedestal, under reamed piles, mass concrete, etc complete all as specified and directed. | 47.41 | Cum | 8,160 ₹3,86,865.6 | 8,500 ₹4,02,985 | 10,500 ₹4,97,805 | 8,500 ₹4,02,985 | 8,000 ₹3,79,280 Lowest | 9,000 ₹4,26,690 | 8,550 ₹4,05,355.5 | 9,000 ₹4,26,690 | 8,200 ₹3,88,762 | 9,000 ₹4,26,690 |
Tender Value
₹38.6 L
EMD Value
₹77,260
Closing Date
7 Jul 2026, 6:00 pmClosed
GE DANAPUR
DANAPUR CANTT
SPECIAL REPAIR TO BOUNDARY WALL AT VAISHALI ENCLAVE IN DANAPUR CANTT
2026_MES_772594_1
CA NO GE/DNR/T-19 of 2026-27
Open Tender
Civil Works
Item Rate
180 days
DANAPUR CANTT
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE DANAPUR
₹77,260
Yes
13 Aug 2026
16 Jun 2026
14 Jul 2026
16 Jun 2026
7 Jul 2026
1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick/Stone masnory work built in cement mortar including all quions, arches, pillars, etc complete all as specified and directed. | 66 | Cum | - | - |
| 2 | Demolition of cement concrete in ground floors and paving (un reinforced) n exc. 15 cm. thicknesses, below or above ground level complete all as specified and directed. | 1.5 | Cum | - | - |
| 3 | Demolition of reinforced cement concrete in roof or any descsription complete all as specified and directed. | 1.5 | Cum | - | - |
| 4 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. | 20.6 | Qtl | - | - |
| 5 | Boring holes 3.5m deep in soil for single under reamed piles and getting out and disposal of soil to a distance n.exc 50m (dia of pile 300mm) complete all as specified and directed. | 84 | Each | - | - |
| 6 | Excavation in trenches in soft/ loose soil not exc 1.5m wide and not exc 1.5m deep for foundation, pier holes etc n. exc 10 sqm on plan and getting out complete all as specified and directed. | 52.81 | Cum | - | - |
| 7 | M&L plain cement concrete 1:4:8 type D-2 using 40mm graded stone aggregate in foundation, filling and mass concrete complete all as specified and directed. | 12.92 | Cum | - | - |
| 8 | M&L for Mild steel TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips | 6,295 | Kg | - | - |
| 9 | All as per item above but 5mm dia and over in stirrups, spacers and binders complete. | 1,573.75 | Kg | - | - |
| 10 | M&L reinforced cement concrete M-25 design mix using 20mm graded stone aggregate as in foundations, footing, foundation beams, plinth beams, bases for columns, pedestal, under reamed piles, mass concrete, etc complete all as specified and directed. | 47.41 | Cum | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_865118.xls
BOQ • 5.49 MB
Credit9055.pdf
Additional Documents • 0.20 MB
Tender9055.pdf
Tender Documents • 0.52 MB
ParticularSpecification9055.pdf
Additional Documents • 0.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .