Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance | -27.56% | ₹2.6 L | L1 | Admitted-Finance |
| 2 | L2₹3.4 L+₹74,736.80 (28.6%)Admitted-Finance | -6.86% | ₹3.4 L+₹74,736.80 (28.6%) | L2 | Admitted-Finance |
Tender Value
₹3.6 L
EMD Value
₹7,220
Closing Date
29 May 2026, 4:00 pmClosed
Executive Engineer ID-I Jammu
Office of the Executive Engineer ID-I Jammu
Restoration of diversion bund of Karloop Khul at Head Site.
2026_IFC_310058_1
e-NIT 09 of 2026-27
Open Tender
Civil Works
Percentage
20 days
Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
Executive Engineer ID-I Jammu
₹7,220
30 Jul 2026
15 May 2026
30 May 2026
16 May 2026
29 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil. | 66.72 | cum | 256.85 | ₹17,137.03 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: All kinds of soil : | 16.68 | cum | 479.3 | ₹7,994.72 |
| 3 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 189 | cum | 371.15 | ₹70,147.35 |
| 4 | Filling available excavated earth ( excluding rock) in trenches plinth sides of foundation includijng all leads etc in layers not exceeding 20CM in depth, including all leads and lifts. | 25.02 | cum | 180.55 | ₹4,517.36 |
| 5 | Supply of stone. | 160.65 | cum | 700 | ₹1,12,455 |
| 6 | Carriage of stone aggregate average distance of 20Km by MT. | 160.65 | cum | 482.31 | ₹77,483.1 |
| 7 | Supply of K. crates (6x1.5x1.5)m including carriage. | 14 | nos. | 5,100 | ₹71,400 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_1003289.xls
BOQ • 0.33 MB
corrigendum.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .