| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹13.5 L+₹9,680 (0.72%)Rejected-Finance | L2 | Rejected-Finance Highest | |
| 3 | L3₹13.5 L+₹11,120 (0.83%)Rejected-Finance | L3 | Rejected-Finance Highest |
Tender Value
₹13.5 L
EMD Value
₹13,500
Closing Date
18 Oct 2023, 6:00 pmClosed
Superintending Engineer
(132/33 KV Campus) Gauriganj, Distt. Amethi.
Remaining work of Transformer capacity increasing, VCB installation and line related work in the area of Electricity Distribution Division- IInd (Amethi), Distt. Amethi under System Augmentation/Strengthening work in Different District.
2023_MVVNL_848519_1
49/E.D.C.(G.)/2023-24
Open Tender
Electrical Works
Lump-sum
90 days
EDD-IInd (Amethi), Distt. Amethi.
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE
₹13,500
21 Oct 2023
9 Oct 2023
19 Oct 2023
9 Oct 2023
18 Oct 2023
9 Oct 2023
Amount
Loading, carriage of following items from Store Centre, Gauriganj/Sultanpur to site store (distance 0-70 km.)
VCB incoming
VCB outgoing
Cable jointing Kit 3x185sq.mm.
Cable jointing Kit I/D 3x300 sq.mm.
11 KV XLPE cable (3x185 sqmm.)
11 KV XLPE cable (3x300 sqmm.)
XLPE PVC LT Cable (1x400 sqmm.) (1x240 sqmm.)
Stay set complete
Earthing complete
250 KVA Transformer
Concreting & nuzzling of stay complete including fixing of necessary clamps with the help of nuts & bolts other accessorise required for completing the work as well as its grouting by civil material viz. Sand, stone ballast and cement. The contractor will provide all civil material as well as stay insulator
Underground laying of 11 KV XLPE cable of size 3x185 sqmm. as per RESPO norms.
Underground laying of 11 KV XLPE cable of size 3x300 sqmm. as per RESPO norms.
Spreading, Laying of L.T. Cable (1x400 sqmm.) (1x240 sqmm.)
Construction of plinth for 250 KVA transformer of 2x2x1.2 mtr. with help of first class brick and masonry 1:4 cement & coarse sand. Filling the structure completely as per norm with RCC to 1:2:2 cement & stone grit with M.S. bar & M.S. for restling the transformer.
Installation of 250 KVA Transformer on newly constructed plinth making proper connections from 11 KV system and proper testing as well as commissioning of Transformer.
Construction of fencing for newely constructed Transformer plinth as per RESSPO norms.
Earthing of 11/0.4 KV T/F with sutable G.I. pipe and fixing sutable G.I. Strip including all material requaired to complete the work.
Fixing & Installation of 11 KV jointing kit indoor/outdoor. as per RESSPO norms.
Installation and charging of incoming/outgoing VCB as per RESSPO norms.
VCB incoming
VCB outgoing
Dismantling/Loading/unloading, carriage of Old Transformer from site store to store center Gauriganj/Sultanpur to dump store. (distance 0 to 70 Km.)
Handover of received materials to store center Gauriganj.
Note: If any work which has been left over in BOQ and is necessary to complete the work, the same will be carried out by working agency free of cost.
PRAGATI CONSTRUCTION
SHRI HANUMAN ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .