Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC | ₹2.0 Cr | L1 | Accepted-AOC first lowest |
| 2 | L2₹2.5 CrRejected-Finance | ₹2.5 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹2.7 CrRejected-Finance GANDHI NAGAR DISTRICT MAHOBA UTTAR PRADESH | MAHOBA | UTTAR PRADESH | 210421 | ₹2.7 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹2.7 CrRejected-Finance | ₹2.7 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹2.8 CrRejected-Finance | ₹2.8 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | MUSKAN CONSTRUCTION L2 | USHA BAJPAI L4 | M/S LODHI ENTERPRISES L6 | M/s Trivedi Associates L3 | M/S SURESH CHANDRA GUPTA L5 | M/S KASON CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in filling in embankment including mechanical compaction dressing and watering with all leads and lifts and T&P etc. for proper compaction of work including all tax like income tax labour cess e.t.c but excluding G.S.T. | 96,478.75 | Cum. | 187.95 ₹1,81,33,181.06 | 212 ₹2,04,53,495 | 213.9 ₹2,06,36,804.63 | 213 ₹2,05,49,973.75 | 215 ₹2,07,42,931.25 | 141.45 ₹1,36,46,919.19 |
| 2.00 | Earth work in Excavation in making canal section in all type of starta excluding hard granite rock including compaction, dressing, watering and disposal of excavated material as directed by Engineer in charge including all lift and T&P etc for proper completion of job. | 4,474.7 | Cum. | 107.78 ₹4,82,283.17 | 109.8 ₹4,91,322.06 | 109 ₹4,87,742.3 | 109 ₹4,87,742.3 | 109 ₹4,87,742.3 | 109 ₹4,87,742.3 |
| 3.00 | E/w excavation in foundation of MKR mixed soil including initial lead and lift etc. all complete. | 2,759.98 | Cum. | 100.99 ₹2,78,730.38 | 119.5 ₹3,29,817.61 | 119 ₹3,28,437.62 | 119 ₹3,28,437.62 | 119 ₹3,28,437.62 | 119 ₹3,28,437.62 |
| 4.00 | Supplying & laying coarse sand in foundation with all cost of material, labour, T&P etc required for completion of work. | 75.13 | Cum. | 1,815.75 ₹1,36,417.3 | 1,839.2 ₹1,38,179.1 | 1,839 ₹1,38,164.07 | 1,832 ₹1,37,638.16 | 1,839 ₹1,38,164.07 | 1,832.9 ₹1,37,705.78 |
| 5.00 | Laying C.C. work 1:3:6 with cement course sand and stone grit 25 to 50 mm including all cost of material, labour, T&P and proper completion of work. | 654.53 | Cum. | 4,130.99 ₹27,03,856.88 | 4,284.15 ₹28,04,104.7 | 4,284 ₹28,04,006.52 | 4,142 ₹27,11,063.26 | 4,192 ₹27,43,789.76 | 4,142.1 ₹27,11,128.71 |
| 6.00 | R.C.R. Stone masonry with 1:4 cement course sand including all cost of material, labour: T&P and proper completion of work. | 471.77 | Cum. | 4,740.45 ₹22,36,402.1 | 4,822.45 ₹22,75,087.24 | 4,822 ₹22,74,874.94 | 4,752 ₹22,41,851.04 | 4,759 ₹22,45,153.43 | 4,752.05 ₹22,41,874.63 |
| 7.00 | Laying R.C.C. 1:1.2 in slab with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 11.98 | Cum. | 6,840.59 ₹81,950.27 | 7,225.5 ₹86,561.49 | 7,225 ₹86,555.5 | 6,873 ₹82,338.54 | 4,925 ₹59,001.5 | 6,873.8 ₹82,348.12 |
| 8.00 | Steel Reinforcement for RCC work including cutting, placing & binding with GI wire etc. all complete But excluding GST. | 0.54 | MT | 64,192.95 ₹34,664.19 | 69,002 ₹37,261.08 | 69,002 ₹37,261.08 | 64,291 ₹34,717.14 | 64,291 ₹34,717.14 | 64,291.75 ₹34,717.55 |
| 9.00 | Cement pointing in 1:2 cement mortor with coarse sand including all material, labour, T&P etc. complete. | 680.14 | sqm. | 98.98 ₹67,320.26 | 124.8 ₹84,881.47 | 124 ₹84,337.36 | 122 ₹82,977.08 | 122 ₹82,977.08 | 122.5 ₹83,317.15 |
| 10.00 | Centering & Shuttering for R.C.C. work with all cost of labour material T&P etc. required for completion of work. | 314.19 | sqm. | 810.1 ₹2,54,525.32 | 900 ₹2,82,771 | 817 ₹2,56,693.23 | 817 ₹2,56,693.23 | 817 ₹2,56,693.23 | 817 ₹2,56,693.23 |
Tender Value
Refer Docs
EMD Value
₹5.5 L
Closing Date
1 Sept 2025, 3:30 pmClosed
SE ICC MAHOBA
SE ICC BAZARIYA MAHOBA
Balance Earth work and Pucca work of Sirsikala Minor(Lot-2)
2025_UPIDC_1065174_3
01/SE/2025-26
Open Tender
Civil Works
180 days
MAHOBA
AS PER TENDER DOCUMENT AND NIT
2 documents required · 2 mandatory
₹5,948
₹5.5 L
25 Feb 2026
14 Aug 2025
1 Sept 2025
14 Aug 2025
1 Sept 2025
14 Aug 2025
Amount
Earth work in filling in embankment including mechanical compaction dressing and watering with all leads and lifts and T&P etc. for proper compaction of work including all tax like income tax labour cess e.t.c but excluding G.S.T.
Earth work in Excavation in making canal section in all type of starta excluding hard granite rock including compaction, dressing, watering and disposal of excavated material as directed by Engineer in charge including all lift and T&P etc for proper completion of job.
E/w excavation in foundation of MKR mixed soil including initial lead and lift etc. all complete.
Supplying & laying coarse sand in foundation with all cost of material, labour, T&P etc required for completion of work.
Laying C.C. work 1:3:6 with cement course sand and stone grit 25 to 50 mm including all cost of material, labour, T&P and proper completion of work.
R.C.R. Stone masonry with 1:4 cement course sand including all cost of material, labour: T&P and proper completion of work.
Laying R.C.C. 1:1.2 in slab with all cost of sand, cement & stone ballast T&P etc required for completion of work.
Steel Reinforcement for RCC work including cutting, placing & binding with GI wire etc. all complete But excluding GST.
Cement pointing in 1:2 cement mortor with coarse sand including all material, labour, T&P etc. complete.
Centering & Shuttering for R.C.C. work with all cost of labour material T&P etc. required for completion of work.
Laying and fixing joint filler bond 20 mm including cost of sealing compound labour, T&P etc required for proper completion of work.
Providing & Fixing drainage spout pipe of G.I. 100 mm dia including cost of labour T&P etc required for proper completion of work.
Providing & Fixing wheel guard including cost of labour T&P etc required for proper completion of work.
Dry stone pitching with all cost of labour material T&P etc. required for completion of work.
Laying C.C. 1:2:4 in Top of stone masonry with all cost of sand, cement & stone ballast T&P etc required for completion of work.
MUSKAN CONSTRUCTION (BID ID -5471735)
M/s Trivedi Associates (BID ID -5496969)
USHA BAJPAI (BID ID -5495459)
M/S SURESH CHANDRA GUPTA (BID ID -5491827)
M/S LODHI ENTERPRISES (BID ID -5498786)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1 (1).pdf
PDF • 4.80 MB
BOQ_1942446.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid