Loading…
Loading…
| Sl No | Description | Qty | Unit | Kesavan L1 | Sivaraman L2 |
|---|---|---|---|---|---|
| 1.01Construction of Horiziontal Subsurface Flow Constructed wetland with Screen and setting chamber @ Village East Street in Thozhudur panchayat | |||||
| 1.02 | Earth work excavation in all classes of soils as per SS 20B for narrow foundation etc complete | 26.6 | Cum | 260 ₹6,916 Lowest | 263 ₹6,995.8 |
| 1.03 | CC 1:4:8mix using 40 mm HBG metal including cost & conveyance and labour charges etc complete. | 2.98 | Cum | 5,580 ₹16,628.4 Lowest | 5,582 ₹16,634.36 |
| 1.04 | Supply & Erection of centring for sides including cost & conveyance and labour charges etc complete. | 9 | Sqm | 547 ₹4,923 Lowest | 547.5 ₹4,927.5 |
| 1.05 | Cement Concrete 1:3:6 mix using 20 mm HBG ISS metal including cost & conveyance and labour charges etc complete. | 1.13 | Cum | 6,343 ₹7,167.59 Lowest | 6,343 ₹7,167.59 Lowest |
| 1.06 | Brick Work in CM 1:5 mix using Country Briks including cost & conveyance and labour charges etc complete. | 4.37 | Cum | 6,160 ₹26,919.2 Lowest | 6,160 ₹26,919.2 Lowest |
| 1.07 | Plastering in CM 1:5 mix to 12mm thick including cost & conveyance and labour charges etc complete. | 25.15 | Sqm | 285 ₹7,167.75 Lowest | 285 ₹7,167.75 Lowest |
| 1.08 | Plastering in CM 1:4 mix to 20mm thick including cost & conveyance and labour charges etc complete. | 21.72 | Sqm | 591 ₹12,836.52 Lowest | 591 ₹12,836.52 Lowest |
| 1.09 | filling 20 mm Metal | 2.16 | Cum | 2,175 ₹4,698 Lowest | 2,175 ₹4,698 Lowest |
| 1.10 | filling 6-8mm chips | 8.64 | Cum | 1,362 ₹11,767.68 Lowest | 1,364 ₹11,784.96 |
Tender Value
₹1.4 L
EMD Value
₹2,000
Closing Date
27 Jul 2026, 4:00 pmClosed
Block Development Officer(V.Pt), Mangalur
Block Development Officer(V.Pt), Mangalur
Horizontal Subsurface flor constructed wetland chamber at Village East street in Thozhudur
2026_RDTN_684285_1
B5/1612/2026
Open Tender
Civil Works
Item Rate
Horizontal Subsurface flor constructed wetland cha
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,000
29 Jul 2026
7 Jul 2026
27 Jul 2026
7 Jul 2026
27 Jul 2026
7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Construction of Horiziontal Subsurface Flow Constructed wetland with Screen and setting chamber @ Village East Street in Thozhudur panchayat | - | - | - | - |
| 1.02 | Earth work excavation in all classes of soils as per SS 20B for narrow foundation etc complete | - | Cum | 263.78 | - |
| 1.03 | CC 1:4:8mix using 40 mm HBG metal including cost & conveyance and labour charges etc complete. | - | Cum | 5,584.96 | - |
| 1.04 | Supply & Erection of centring for sides including cost & conveyance and labour charges etc complete. | - | Sqm | 547.5 | - |
| 1.05 | Cement Concrete 1:3:6 mix using 20 mm HBG ISS metal including cost & conveyance and labour charges etc complete. | 1 | Cum | 6,343.38 | ₹6,337.04 |
| 1.06 | Brick Work in CM 1:5 mix using Country Briks including cost & conveyance and labour charges etc complete. | - | Cum | 6,163.05 | - |
| 1.07 | Plastering in CM 1:5 mix to 12mm thick including cost & conveyance and labour charges etc complete. | 1 | Sqm | 285.24 | ₹284.95 |
| 1.08 | Plastering in CM 1:4 mix to 20mm thick including cost & conveyance and labour charges etc complete. | 1 | Sqm | 591.25 | ₹590.66 |
| 1.09 | filling 20 mm Metal | - | Cum | 2,176.79 | - |
| 1.1 | filling 6-8mm chips | - | Cum | 1,364.29 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
HoriTholudurTD.pdf
Tender Documents • 2.03 MB
BOQ_822566.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .