Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC NO 83 THAMMAIAH GARDEN ABBIGERE CHIKKABANAVARA PO BANGALORE 560 090 | BENGALURU URBAN | KARNATAKA | 560090 | ₹1.2 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹1.3 Cr+₹29,952.09 (0.24%)Rejected-Finance NO 439 AHIV ADAN 11ND FLOOR 2RD STAGE INDIRA NAGAR BANGALORE 560 075 | BENGALURU URBAN | KARNATAKA | 560075 | ₹1.3 Cr+₹29,952.09 (0.24%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹1.3 Cr+₹3.0 L (2.40%)Rejected-Finance 04 L BLOCK MARKET SECTOR 11 NOIDA 201301 UP GAUTAM BUDHA NAGAR | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹1.3 Cr+₹3.0 L (2.40%) | L3 | Rejected-Finance Not being L1 |
| 4 | L4₹1.3 Cr+₹8.9 L (7.16%)Rejected-Finance | ₹1.3 Cr+₹8.9 L (7.16%) | L4 | Rejected-Finance Not being L1 |
| 5 | L5₹1.4 Cr+₹11.9 L (9.53%)Rejected-Finance NO 68 ANJANEYA TEMPLE CROSS OPP M S RAMAIAH HOSPITAL NEW BEL ROAD BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | ₹1.4 Cr+₹11.9 L (9.53%) | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | devan enterprises L5 | M/S SRI BALAJI ENTERPRISES L1 | B5BUILDING SOLUTIONS L4 | Shiva Shakthi Electrical Enterprises L2 | LAKSHMI ELECTRICAL ENTERPRISES L6 | GEPS PROJECTS L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavating in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth for laying of cable, foundation etc, and getting out in soft / loose soil, complete all as specified & directed. | 344.3 | CUM | 350 ₹1,20,505 | 350 ₹1,20,505 | 300 ₹1,03,290 | 270 ₹92,961 | 475 ₹1,63,542.5 | 150 ₹51,645 Lowest |
| 2.00 | Returning filling in including spreading, leveling watering and well ramming in layers not exceeding 25cm, complete all as specified & directed. | 238.7 | CUM | 160 ₹38,192 | 60 ₹14,322 | 110 ₹26,257 | 45 ₹10,741.5 Lowest | 150 ₹35,805 | 60 ₹14,322 |
| 3.00 | Removing excavated surplus soil to a distance not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point, complete all as specified & directed. | 36.7 | CUM | 220 ₹8,074 | 75 ₹2,752.5 | 120 ₹4,404 | 45 ₹1,651.5 Lowest | 150 ₹5,505 | 60 ₹2,202 |
| 4.00 | Excavating in post holes (or similar holes) each not exceeding 0.5 cum, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25cm and all as specified and as directed | 32 | CUM | 450 ₹14,400 | 225 ₹7,200 | 450 ₹14,400 | 270 ₹8,640 | 750 ₹24,000 | 180 ₹5,760 Lowest |
| 5.00 | Material & Labour for Sand filling under floors or in foundations including watering and consolidation, all as specified and directed. | 4.4 | CUM | 2,000 ₹8,800 | 2,000 ₹8,800 | 1,400 ₹6,160 | 999 ₹4,395.6 | 2,100 ₹9,240 | 990 ₹4,356 Lowest |
| 6.00 | Material and Labour for Spreading ribbed soil in trenches as in cable cushioning all as per IS 1255-1983, complete all as specified & directed.
Note :-
(i) Excavated approved soil shall be ribbed by using sieve to separate composite particles etc as per IS and refiiling in trenches before laying of cable 8 CM and 15 CM after laying of cable. This is than gently punned down to a depth of 10 cm above the top of upper most cable
(ii) For the purpose of measurement only punned thickness only will be considered for paymet. | 68.9 | CUM | 450 ₹31,005 | 200 ₹13,780 | 180 ₹12,402 | 99.1 ₹6,827.99 Lowest | 850 ₹58,565 | 900 ₹62,010 |
| 7.00 | Material & Labour for broken stone boulders Hardcore of gauge not exceeding 63 mm deposited, spread and levelled in layers not exceeding 15 cm thick, watered and rammed using power roller exceeding 8 tonne and not exceeding 12 tonne capacity to a true surface with broken stones or boulders all as specified | 2.4 | CUM | 2,000 ₹4,800 | 2,300 ₹5,520 | 1,900 ₹4,560 | 1,800 ₹4,320 Lowest | 6,500 ₹15,600 | 3,600 ₹8,640 |
| 8.00 | Material and labour for Plain cement concrete 1:2:4 type B1 (using 20 mm aggregate stone aggregate) in foundations filling and mass concrete, complete all as specified & directed. | 2.2 | CUM | 8,000 ₹17,600 | 5,000 ₹11,000 | 6,500 ₹14,300 | 4,500 ₹9,900 Lowest | 8,200 ₹18,040 | 8,100 ₹17,820 |
| 9.00 | Material and labour for PCC 1:3:6 type C-2 (using 40 mm graded stone aggregate) as in coping / collar of poles including necessary form work, complete all as specified & directed. | 2.2 | CUM | 7,000 ₹15,400 | 5,500 ₹12,100 | 6,000 ₹13,200 | 4,500 ₹9,900 Lowest | 8,500 ₹18,700 | 8,100 ₹17,820 |
| 10.00 | Material & Labour for MS work in circular tubes, compound girders and stanchions, lattice girders, aerial masts, staging for water tanks and the like including caps, bases, splices etc. built up from two or more beam or channel sections or angles with plates, including all lattice bars, stiffeners, gusset plates, etc conforming to Fe-410-W (Gde-E-250) quality-B, complete all as specified and directed. | 411 | KG | 160 ₹65,760 | 135 ₹55,485 Lowest | 135 ₹55,485 Lowest | 135 ₹55,485 Lowest | 165 ₹67,815 | 150 ₹61,650 |
Tender Value
₹1.5 Cr
EMD Value
₹2.2 L
Closing Date
8 Aug 2025, 6:00 pmClosed
Ranjeet Kumar, IDSE, CWE
Commander Works Engineers AF South Gangamma Circle Opp Guard Room 410 AFS Jalahalli Bangalore 560013
SPECIAL REPAIR / REPLACEMENT OF SEPARATE FEEDER LINE AND CONVERSION OF TWO / FOUR POLE TO RMU AT AFTC UNDER GE(AF) (M) (AF) JALAHALLI
2025_MES_720022_1
85346/E8
Open Tender
Civil Works
Item Rate
180 days
GE (M) (AF) Jalahalli
As per Tender Document
7 documents required · 7 mandatory
₹1,000
Yes
GE (M) (AF) Jalahalli
₹2.2 L
Yes
8 Sept 2025
12 Jul 2025
15 Aug 2025
12 Jul 2025
8 Aug 2025
1 Aug 2025
12 Jul 2025 - 19 Jul 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .