Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC VIRALIKATTUVILAI MEKKAMANDAPAM P O K K DISTRICT | K K DISTRICT | TAMIL NADU | ₹3.0 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | DENNISH DENSINGH L1 |
|---|---|---|---|---|
| 1.01 | Loading and unloading of 9m poles | 7 | each | 4,200 ₹4,956 |
| 2.01 | Excavation of 9m pole pit on normal ground | 7 | per pit | 5,250 ₹6,195 |
| 3.01 | Erection of 9m pole on normal ground | 7 | per pole | 5,600 ₹6,608 |
| 4.01 | Transportation of 9m poles from road side to pole pit upto 2 KM | 7 | each pole | 5,600 ₹6,608 |
| 5.01 | Loading and unloading of 8m poles | 5 | per pole | 2,000 ₹2,360 |
| 6.01 | Excavation of 8m pole pit on normal ground | 5 | per pit | 2,500 ₹2,950 |
| 7.01 | Erection of 8m pole on normal ground | 5 | per pole | 2,750 ₹3,245 |
| 8.01 | Transportation of 8m poles from road side to pole pit upto 2 KM | 5 | each pole | 3,000 ₹3,540 |
| 9.01 | Drilling of Slotted Holes | 25 | each | 1,875 ₹2,212.50 |
| 10.01 | Transporting of Line materials from section office to workspot upto 20 KM. | 3 | Upto one tonne | 2,400 ₹2,832 |
Tender Value
Refer Docs
EMD Value
₹2,980
Closing Date
28 Jan 2026, 2:00 pmClosed
EE/TKY
TNEB TKY
Imp Estimate for LT aged conductor ACSR 7 2 59 into ACSR 7 3 35 in existing thattaravilai ss1 63 KVA in 11 KV vaniagudi under chemponvilai section in Eraniel c and i section in Thuckalay division
2026_EB_644020_1
EE/D/TKY/ETW 33/Dt.14.01.2026
Open Tender
Electrical Works
90 days
EE/TKY
As Specified Tender
3 documents required · 3 mandatory
₹0
₹2,980
Yes
7 Mar 2026
14 Jan 2026
29 Jan 2026
15 Jan 2026
28 Jan 2026
15 Jan 2026
15 Jan 2026 - 28 Jan 2026
Loading and unloading of 9m poles
Excavation of 9m pole pit on normal ground
Erection of 9m pole on normal ground
Transportation of 9m poles from road side to pole pit upto 2 KM
Loading and unloading of 8m poles
Excavation of 8m pole pit on normal ground
Erection of 8m pole on normal ground
Transportation of 8m poles from road side to pole pit upto 2 KM
Drilling of Slotted Holes
Transporting of Line materials from section office to workspot upto 20 KM.
Erection of V cross arm
Erection of tapping channel cross arm
Erection of HT pin insulator
Fixing of HT TI fittings
Dismantling and Fixing of LT three phase cross arm
Fixing of LT three phase cross arm
Dismantling and Fixing of LT pin insulator
Fixing of LT pin insulator
Fixing of shackle
Dismantling and Fixing of LT shackle
Dismantling &Fixing of LT single phase cross arm
Changing of HT pin point to cut point
Excavation of stay pit on normal ground
Erection of stay set on normal ground
Stringing of 11 KV lines for ACSR 7/4.09 mm conductor
Stringing of 11 KV lines for ACSR 7/3.35 mm conductor
Dismantling and Reerection of LT lines for ACSR 7 / 2.29 conductor.
Erection of LT lines for ACSR 7 / 2.29 conductor.
Dismantling of LT lines for ACSR 7 / 2.29 conductor.
Erection of double pole Distribution Transformer structure
Painting double pole (colour washing with distember) including cost of paint.
Double pole transformer structure materials (double coat) including cost of aluminium paint.
Erection of 63KVA Distribution Transformer
Loading & unloading of Distribution Transformer below 250 KVA
For ordinary tree clearance and Throng bushes & trees.
For cocount tree clearance and Throng bushes & trees.
Erection of Street light Switching point arrangement
Erection of Single phase Service connection
Erection of Three phase Service connection
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Tendernotice_2.pdf
PDF • 1.18 MB
BOQ_771674.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid