Tender Value
₹35.8 L
EMD Value
₹36,500
Closing Date
6 May 2020, 3:00 pmClosed
The Project Director
DRDA,Vellore
Renovation of 3 no of Ponds Ooranies,Kulam Kuttai in Thimiri Block of Vellore District under Renovation of Rural Water Bodies SFC Grant 2019-20 Package no-28
2020_RDTN_158272_1
A9/3844/2020
Open Tender
Civil Works - Others
Item Rate
180 days
DRDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹36,500
6 Jun 2020
18 Feb 2020
6 May 2020
18 Feb 2020
6 May 2020
18 Feb 2020
Amount
1. Rejuvenation of Nangamangalam Kulam @ Dhamaraipakkam Village In Thimiri Block
Clearing the Scrub Jungle, Julliflora Jungle and disponsing of the same as directed by the Engineer incharge of works and as per technical specifical (Specification 2.2)
Julliflora Jungle with uprooting
Earth work in all soils except hard rock requiring blasting and conveying and formation of bound with 0 to 100m deploying earth moving machineries and tippers including benching, formation of bunds breaking clods, sectioning, labour and Hire charges for closing breaches for extra watering and consolidation power roller including hire charges etc complete
Total Earth work Quantity
Construction of Retaining Wall for Baby Pond
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
CC 1:3:6 mix using 40 mm metal including cost and conveyance and all labour charges etc
Plastering with Cm 1:4, 20 mm thickness including cost and conveyance etc and all labour charges etc.,
Construction of BATHING GHAT, STEPS, OUTER PLATFORM
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
CC 1:3:6 mix using 20 mm metal including cost and conveyance and all labour charges etc
CC 1:3:6 mix using 20 mm metal including cost and conveyance and all labour charges etc
CC 1:2:4 mix using 20 mm metal including cost and conveyance and all labour charges etc.,
Plastering with Cm 1:4, 20 mm thickness including cost and conveyance etc and all labour charges etc.,
Construction of Steps Over Bund
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
CC 1:3:6 mix using 20 mm metal including cost and conveyance and all labour charges etc
CC 1:2:4 mix using 20 mm metal including cost and conveyance and all labour charges etc.,
Plastering with Cm 1:4, 20 mm thickness including cost and conveyance etc and all labour charges etc.,
Construction of Inlet Channel Structure
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
Below GL
Above GL
CC 1:3:6 mix using 40 mm metal including cost and conveyance and all labour charges etc
CC 1:2:4 mix using 20 mm metal including cost and conveyance and all labour charges etc.,
2. Rejuvenation of Dopi Kulam, @ Perumanthangal Village In Thimiri Block
Clearing the Scrub Jungle, Julliflora Jungle and disponsing of the same as directed by the Engineer incharge of works and as per technical specifical (Specification 2.2)
Julliflora Jungle with uprooting
Earth work in all soils except hard rock requiring blasting and conveying and formation of bound with 0 to 100m deploying earth moving machineries and tippers including benching, formation of bunds breaking clods, sectioning, labour and Hire charges for closing breaches for extra watering and consolidation power roller including hire charges etc complete
Total Earth work Quantity
Construction of Retaining Wall for Baby Pond
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
CC 1:3:6 mix using 40 mm metal including cost and conveyance and all labour charges etc
Plastering with Cm 1:4, 20 mm thickness including cost and conveyance etc and all labour charges etc.,
Construction of BATHING GHAT, STEPS, OUTER PLATFORM
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
CC 1:3:6 mix using 40 mm metal including cost and conveyance and all labour charges etc
CC 1:3:6 mix using 20 mm metal including cost and conveyance and all labour charges etc
CC 1:2:4 mix using 20 mm metal including cost and conveyance and all labour charges etc.,
Plastering with Cm 1:4, 20 mm thickness including cost and conveyance etc and all labour charges etc.,
Construction of Steps Over Bund
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
CC 1:3:6 mix using 40 mm metal including cost and conveyance and all labour charges etc
CC 1:2:4 mix using 20 mm metal including cost and conveyance and all labour charges etc.,
Plastering with Cm 1:4, 20 mm thickness including cost and conveyance etc and all labour charges etc.,
Construction of Inlet Channel Structure
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
Below GL
Above GL
CC 1:3:6 mix using 40 mm metal including cost and conveyance and all labour charges etc
CC 1:2:4 mix using 20 mm metal including cost and conveyance and all labour charges etc.,
3. Rejuvenation of Braminar Kulam @ Varagur Village In Thimiri Block
Clearing the Scrub Jungle, Julliflora Jungle and disponsing of the same as directed by the Engineer incharge of works and as per technical specifical (Specification 2.2)
Julliflora Jungle with uprooting
Earth work in all soils except hard rock requiring blasting and conveying and formation of bound with 0 to 100m deploying earth moving machineries and tippers including benching, formation of bunds breaking clods, sectioning, labour and Hire charges for closing breaches for extra watering and consolidation power roller including hire charges etc complete
Total Earth work Quantity
Construction of Retaining Wall for Baby Pond
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
CC 1:3:6 mix using 40 mm metal including cost and conveyance and all labour charges etc
Plastering with Cm 1:4, 20 mm thickness including cost and conveyance etc and all labour charges etc.,
Construction of BATHING GHAT, STEPS, OUTER PLATFORM
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
CC 1:3:6 mix using 40 mm metal including cost and conveyance and all labour charges etc
CC 1:3:6 mix using 20 mm metal including cost and conveyance and all labour charges etc
CC 1:2:4 mix using 20 mm metal including cost and conveyance and all labour charges etc.,
Plastering with Cm 1:4, 20 mm thickness including cost and conveyance etc and all labour charges etc.,
Construction of Steps Over Bund
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
CC 1:3:6 mix using 40 mm metal including cost and conveyance and all labour charges etc
CC 1:2:4 mix using 20 mm metal including cost and conveyance and all labour charges etc.,
Plastering with Cm 1:4, 20 mm thickness including cost and conveyance etc and all labour charges etc.,
Construction of Inlet Channel Structure
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
Below GL
Above GL
CC 1:3:6 mix using 40 mm metal including cost and conveyance and all labour charges etc
CC 1:2:4 mix using 20 mm metal including cost and conveyance and all labour charges etc.,
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
D.EZHIL KUMAR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .