| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-AOC | ₹24.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹24.9 LRejected-AOC | ₹24.9 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | S.Renganathan L2 | V NAMASIVAYAM L1 |
|---|---|---|---|---|---|
| 1.01 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15 cm. thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial leads and lifts, etc., including levelling the sites complete complying with standard specifcations and as directed. | 79.56 | Cum | 270 ₹21,481.20 | 263 ₹20,924.28 |
| 1.02 | Cement concrete 1:4:8 mix using 40mm guage hard broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm thick compacting etc.,complete complying with standard specifications and as directed. | 14.06 | Cum | 5,303 ₹74,560.18 | 5,149 ₹72,394.94 |
| 1.03 | Filling the basement with EXCAVATED EARTH including cost and conveyance of all materials and all labour charges etc., complete. | 29.59 | Cum | 46 ₹1,361.14 | 45 ₹1,331.55 |
| 1.04 | Filling the basement with Red Gravelincluding cost and conveyance of all materials and all labour charges etc complete. | 21.1 | Cum | 336 ₹7,089.60 | 327 ₹6,899.70 |
| 1.05 | Brick work in cement mortar 1:5 mix using IInd class country bricks of size 23 x 11 x 7 CM including the cost and conveyance of all materials and all labour charges and including curring etc., complete complying with standard specifications. | 54.77 | Cum | 6,294 ₹3.4 L | 6,111 ₹3.3 L |
| 1.06 | Supplying and fabrication of steel for RCC items including cost and conveyance of all materials and labour charges etc complete | 4,500 | Kg | 90 ₹4.0 L | 91 ₹4.1 L |
| 1.07 | R.C.C 1:1.5:3 Mix using 20 mm HBG Metal including cost and conveyance of all materials and all labour charges etc complete | 34.24 | Cum | 9,331 ₹3.2 L | 9,060 ₹3.1 L |
| 1.08 | Supplying and erecting for sides and soffits including supports and strutting upto 3.29M height for plane surfaces in all floor is with all cross bracings using mild steel sheets of size 90cm x 60cm and 10 gauges a stiffened welded with mixed steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joists of size 10cm x 60.50cm dia spaced at about 9cm center to center and supported by casuarina props of 10cm to13cm dia spaced at75cm center to center etc., complete complying with standard specification and as directed for the RCC works. Below Ground Level | 49.66 | Sqm | 563 ₹27,958.58 | 547 ₹27,164.02 |
| 1.09 | Above Ground Lrvel | 188.69 | Sqm | 1,127 ₹2.1 L | 1,095 ₹2.1 L |
| 1.10 | Plastering with cement mortar 1:3,10mm thick and including the cost and conveyance of all materials and all labour charges etc.,complete. complying with standard specifications and as directed. | 50.25 | Sqm | 334 ₹16,783.50 | 325 ₹16,331.25 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
9 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (BP) THENI
BLOCK DEVELOPMENT OFFICER (BP) THENI
Construction of Community hall near Karuppasamy Koil at Upparpatty MLACDS 2025-2026
2026_RDTN_650929_1
3329/2025/A6
Open Tender
Civil Works
120 days
THENI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹25,000
13 Feb 2026
4 Feb 2026
9 Feb 2026
4 Feb 2026
9 Feb 2026
4 Feb 2026
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15 cm. thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial leads and lifts, etc., including levelling the sites complete complying with standard specifcations and as directed.
Cement concrete 1:4:8 mix using 40mm guage hard broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15cm thick compacting etc.,complete complying with standard specifications and as directed.
Filling the basement with EXCAVATED EARTH including cost and conveyance of all materials and all labour charges etc., complete.
Filling the basement with Red Gravelincluding cost and conveyance of all materials and all labour charges etc complete.
Brick work in cement mortar 1:5 mix using IInd class country bricks of size 23 x 11 x 7 CM including the cost and conveyance of all materials and all labour charges and including curring etc., complete complying with standard specifications.
Supplying and fabrication of steel for RCC items including cost and conveyance of all materials and labour charges etc complete
R.C.C 1:1.5:3 Mix using 20 mm HBG Metal including cost and conveyance of all materials and all labour charges etc complete
Supplying and erecting for sides and soffits including supports and strutting upto 3.29M height for plane surfaces in all floor is with all cross bracings using mild steel sheets of size 90cm x 60cm and 10 gauges a stiffened welded with mixed steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country wood) joists of size 10cm x 60.50cm dia spaced at about 9cm center to center and supported by casuarina props of 10cm to13cm dia spaced at75cm center to center etc., complete complying with standard specification and as directed for the RCC works. Below Ground Level
Above Ground Lrvel
Plastering with cement mortar 1:3,10mm thick and including the cost and conveyance of all materials and all labour charges etc.,complete. complying with standard specifications and as directed.
WallPutty
Plastering with cement mortar 1:5,12mm thick and including the cost and conveyance of all materials and all labour charges etc.,complete. complying with standard specifications and as directed.
Weathering course concrete using best quality broken brick jelly of size 20mm uniform guage in pure slaked lime (no sand to be used)over the RCC roof slab in the proportion of brick jelly to lime being 32:12:5 by volume and laid over in a single layer and consolidated to the required designed and finished thickness beating the concrete with wooden beaters of approved pattern ,keeping the surface constantly wetted by sprinkling lime jaggery water as per standard specifications etc., complete as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 23cm x 23cm x 2mm of approved quality laid in cement mortar 1:3,12mm thick mixed with water proofing compound confirming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar ,red oxide etc., complete complying with standard specifications.
Ceramic tiles flooring laying with new ceramic tiles of size 305x305x6 mm laid in C M 1:3 20mm thick inulding cost of white cement and labour charges etc
Dadoing the walls with new Glazed tiles of size 150 x150 x6 mm laid in CM 1:2 ,10 mm thick and pointig with white cement using 0.40 Kg/m2 including finishing the joint and pointing flush with ties surface
supply of steel door of size Door-D 1.80 x 2.40
supply of steel window of size 1.50 x 1.30
Labour chrges for fixing of steel door of size
Labour chrges for fixing of steel window, ventilatore of size
supply and delivery of water closet with foot rest
Painting two coat of Plastic emulsion paint over wall plastering surface with best approved first quality of approved colour over the one coat of priming etc., complete complying with standard specification (The paint should be got approved by the departmental officers before use on works )
Painting in two coats over inner wall surface with approved quality of Oil bound distember with colour over one coat of pirming coat including cost and conveyance of all materials to site etc
Painting two coats new iron works such as steel doors, window, ventilators, window bars balustrades etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats etc., complete complying with standard specifications.
Providing the 25mm thickness of granolithic pattern floor finish with plain cement concrete 1:2:4 using hard broken stone 10 to 12mm thick and the top rubbed smooth etc., complete complying with standard specifications and directed
Light Point Wiring with 2 x 2.5 sqmm PVC un Sheated seal cable of 650 v grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with T.W switch box with pointing of suitable colour for open / concealed PVC LIGHT POINT with continuos earth wire connection of 140 SWG TC wire.
Fan Point Wiring with 2 x 2.5 sqmm PVC un Sheated seal cable of 650 v grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with T.W switch box with pointing of suitable colour for open / concealed PVC LIGHT POINT with continuos earth wire connection of 140 SWG TC wire.
Supply and fixing of 1200mm (48”) AC ceiling fan complete with stepped electronic 300w regulator with 1m down rod on the existing clamp SD 103
Supply and fixing of 5A 3 pin and 2 pin combined flush type wall socket with 5 A flush type switch concealed in suitable M.S box in flush with wall SD 130
Supply and run of 2 of 4 Sq.mm (56/0.3) PVC insulated SC unsheathed Cu. conductor of 1100 V on 7/20 GI bearer wire for service connection mains SD 63.
Supply and fixing of 6 way SPDB of 16A / with 16A DPIC switch of 500V (side handle) with F&N on suitable T.W. board with PWD earthling SD 143
Supply and fixing of single box type 4’ 40w flu. fittings complete with copper choke and condenser with TW round blocks on wall (or) ceiling with flu. tube with PVC unsheathed copper lead from terminals to the fittings. SD 83
Supply & Fixing of Tube light with Shade
Supply and fixing of CFL
Supply and delivery of 1000 Litre HDPE Tank
Supply and delivery of PVC Pipes & Specials for Sanitary,Rain water and water Supply arrangement 110mm PVC Pipe-4ksc
110mm PVC Elbow
110mm PVC Bend
110mm PVC Tee
32mm PVC Pipe
25mm PVC Pipe
32mm PVC Elbow
25mm PVC Elbow
32mm PVC Bend
25mm PVC Bend
20mm PVC Tap
Supply and fixing of SS Ramp Hand rail
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 0.74 MB
BOQ_780508.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid