Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical documents submitted |
| 2 | Accepted-Technical H NO 112 NEAR GOVT HOSPITAL PATTEN SANGUEM GOA 403704 | SANGUEM | SOUTH GOA | GOA | 403704 | Accepted-Technical documents submitted |
Tender Value
₹8.4 L
EMD Value
₹16,846
Closing Date
29 Jun 2026, 3:00 pmClosed
Chief Officer
Curchorem Cacora Municipal council
Construction of CC drain near Mahadev Patil house Vijay Padwal house and reconstruction of drain near Holy Cross Chapel at Vodlemol Cacora in ward No IX of CCMC
2026_MC_29701_1
No ccmc/Tech/2026-27/2037 dtd 10/06/2026
Open Tender
Construction Works
Percentage
90 days
Construction of CC drain near Mahadev Patil house
please refer tender documents
4 documents required · 4 mandatory
₹3,000
₹16,846
10 Jul 2026
12 Jun 2026
1 Jul 2026
13 Jun 2026
29 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolishing | |||||
| 1.01 | Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. | 24 | M3 | 1,122 | ₹26,928 |
| 2 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a) All kind of soil | 160.11 | M3 | 291 | ₹46,592.01 |
| 3 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 33.89 | M3 | 2,211 | ₹74,930.79 |
| 4 | Providing & laying cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: aAll works upto plinth level | 82.83 | M3 | 6,635 | ₹5,49,577.05 |
| 5Centering and shuttering including struttings, propping etc. and removal of formwork for : up to plinth level | |||||
| 5.01 | b) vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc. | 301.2 | M2 | 479 | ₹1,44,274.8 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_30125.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .