| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-AOC | ₹10.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.4 LRejected-AOC | ₹10.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Kannan K L2 | M Rajasekar L1 |
|---|---|---|---|---|---|
| 1.00Providing CC Pavement from Ottapatty Puthiranvalavu Chinnappan House to Guruvappan valavu BT road (110 m) H/o Chettimankurichi | |||||
| 2.00 | Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay Foundation per SS 20 A. | 30.24 | cum | 125 ₹3,780 | 120 ₹3,628.80 |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 52.75 | cum | 5,300 ₹2.8 L | 5,285 ₹2.8 L |
| 4.00 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., | 201.6 | cum | 520 ₹1.0 L | 516 ₹1.0 L |
| 5.00 | Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 23.18 | cum | 6,050 ₹1.4 L | 6,015 ₹1.4 L |
| 6.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 42.67 | cum | 2,250 ₹96,007.50 | 2,235 ₹95,367.45 |
| 7.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 37.8 | cum | 6,750 ₹2.6 L | 6,660 ₹2.5 L |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,58,325 ₹1.6 L | 1,57,137 ₹1.6 L |
Tender Value
₹10.5 L
EMD Value
₹10,500
Closing Date
9 Jan 2025, 3:00 pmClosed
BDO (BP)
BDO Office, Edappadi
Providing CC Pavement at Koopukadu MGR negar (200 m) H/O Pakkanadu Panchayat Edappady Block at Salem District MLACDS - 2024-25
2025_RDTN_516311_1
Roc.No.2282/2024/A4
Open Tender
Civil Works
120 days
BDO Office, Edappadi
As per tender document
3 documents required · 3 mandatory
₹0
₹10,500
20 Feb 2026
3 Jan 2025
9 Jan 2025
3 Jan 2025
9 Jan 2025
3 Jan 2025
Amount
Providing CC Pavement from Ottapatty Puthiranvalavu Chinnappan House to Guruvappan valavu BT road (110 m) H/o Chettimankurichi
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay Foundation per SS 20 A.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Kannan K (BID ID -1228245)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx