| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-Finance | ₹8.3 L | L1 | Accepted-Finance Lowest quatation |
| 2 | L2₹8.4 L+₹4,286 (0.52%)Rejected-Finance | ₹8.4 L+₹4,286 (0.52%) | L2 | Rejected-Finance highest quatation |
| Sl No | Description | Qty | Unit | RamgayathiriConstructions L2 | Gobalakrishnan L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with initial lead of 10 meters and initial lift of 2 meters in hard stiff clay, stiff block cotton hard red earth, murrains, gravel stoney earth and earth mixed with small size boulders and hard gravel soil etc., complete as per standard specification | 29 | m3 | 248 ₹7,192 | 246 ₹7,134 Lowest |
| 2.00 | Plain Cement concrete 1:4:8 mix using 40mm HBG metal for foundation and flooring including cost of all materials to site and all labour charges for mixing, laying and curing etc., complete as per standard specification | 5 | m3 | 5,629 ₹28,145 | 5,626 ₹28,130 Lowest |
| 3.00 | Centering for sides and soffitts RCC slab (or) plane surface including strutting 3m height including cost and conveyance & all labour charges etc., complete | 70 | m2 | 461 ₹32,270 | 459 ₹32,130 Lowest |
| 4.00 | Supply and fabrication of steel including cost and conveyance of al materials to site and all labour charges etc., to complete as per std., specification. | 640 | Kg | 89 ₹56,960 Lowest | 89 ₹56,960 Lowest |
| 5.00 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. | 8 | m3 | 8,608 ₹68,864 | 8,607 ₹68,856 Lowest |
| 6.00 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand ) using new best II class Bricks of size 9 x 41/2 x 3 from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing, laying and curing etc. complete. complying with std. specifications. | 12 | m3 | 7,201 ₹86,412 | 7,199 ₹86,388 Lowest |
| 7.00 | Collection supply and filling of gravel filling approved quarry including cost and Conveyance of all materials to site and all labour charges for filling etc., Complete. | 6 | m3 | 398 ₹2,388 | 397 ₹2,382 Lowest |
| 8.00 | Providing M.S grills , Grill doors, and steel doors works as per the design given including cost of steel and also in all floors and all other labour charges etc complete complying with standard specificationI | 126 | Kg | 106 ₹13,356 | 104.5 ₹13,167 Lowest |
| 9.00 | Special ceiling Plastering in Cement Mortor 1:3 Mix (one Cement, Three sand ) 10mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications-10 m2. | 12 | m2 | 313 ₹3,756 | 311 ₹3,732 Lowest |
| 10.00 | Plastering in Cement Mortor 1:5 Mix (one cement, five sand) 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 240 | m2 | 274 ₹65,760 | 272 ₹65,280 Lowest |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
13 Jul 2026, 3:00 pmClosed
Executive Officer
Executive Officer Sethiyathope TP
Construction of New Community Toilet at Ward No 2 Sethiyathope Town Panchayat
2026_DTP_684545_1
166/2025
Open Tender
Civil Works - Buildings
Works
90 days
Sethiyathope TP
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
Yes
20 Jul 2026
8 Jul 2026
13 Jul 2026
8 Jul 2026
13 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation and depositing on bank with initial lead of 10 meters and initial lift of 2 meters in hard stiff clay, stiff block cotton hard red earth, murrains, gravel stoney earth and earth mixed with small size boulders and hard gravel soil etc., complete as per standard specification | - | m3 | - | - |
| 2 | Plain Cement concrete 1:4:8 mix using 40mm HBG metal for foundation and flooring including cost of all materials to site and all labour charges for mixing, laying and curing etc., complete as per standard specification | - | m3 | - | - |
| 3 | Centering for sides and soffitts RCC slab (or) plane surface including strutting 3m height including cost and conveyance & all labour charges etc., complete | - | m2 | - | - |
| 4 | Supply and fabrication of steel including cost and conveyance of al materials to site and all labour charges etc., to complete as per std., specification. | - | Kg | - | - |
| 5 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. | - | m3 | - | - |
| 6 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand ) using new best II class Bricks of size 9 x 41/2 x 3 from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing, laying and curing etc. complete. complying with std. specifications. | - | m3 | - | - |
| 7 | Collection supply and filling of gravel filling approved quarry including cost and Conveyance of all materials to site and all labour charges for filling etc., Complete. | - | m3 | - | - |
| 8 | Providing M.S grills , Grill doors, and steel doors works as per the design given including cost of steel and also in all floors and all other labour charges etc complete complying with standard specificationI | - | Kg | - | - |
| 9 | Special ceiling Plastering in Cement Mortor 1:3 Mix (one Cement, Three sand ) 10mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete . complying with std. specifications-10 m2. | - | m2 | - | - |
| 10 | Plastering in Cement Mortor 1:5 Mix (one cement, five sand) 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | - | m2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_822881.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .