Loading…
Loading…
Tender ID
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹6.7 LAWARDED | AWARDED |
Tender Value
₹7.9 L
EMD Value
₹20,000
Closing Date
23 Sept 2025, 9:30 pmClosed
Directorate of Municipal Administration
Construction of kaman to main road of padadyan hakkal in w no71
DMA/2025-26/OW/WORK_INDENT47247
DMA/2025-26/OW/WORK_INDENT47247
Open
Other Works
Electronic Documents, First(One Cover)
DMA City Corporation Hubballi-Dharawada
₹500
₹20,000
12 Sept 2025
12 Sept 2025
20 Sept 2025
Construction of kaman to main road of padadyan hakkal in w no71
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position cement concrete for allFoundation works. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machinemixed with super p...
Providing and laying in position cement concrete for allSuper structures of building , Road works, Water works, Irrigation works& super structure works of bridges upto 3.50 m height. The granite/trap/...
Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mor...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcementincluding cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying ...
Additionalities for Formwork, Centering & Scaffolding: foundation up to plinth (3%)
Additionalities for Formwork, Centering & Scaffolding: Column (70%)
Additionalities for Formwork, Centering & Scaffolding: beam(60%)
Additionalities for Formwork, Centering & Scaffolding: slab (50%)
Additionalities for Formwork, Centering & Scaffolding:Architectural Arc (45%)
Providing and laying flooring and steps fine dressed granite stone slabs40 mm thick on cement mortar bed 1:6, 25 mm thick, and pointed with cement mortar 1:3 over existing cement concrete bed , includ...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .