Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹90.3 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹91.3 Cr+₹92.6 L (1.03%)Admitted-Finance 1ST FLOOR B 116 VIBHUTI KHAND GOMTI NAGAR LUCKNOW U P | LUCKNOW | LUCKNOW | UTTAR PRADESH | L2 | Admitted-Finance | ||
| 3 | L3₹93.6 Cr+₹3.3 Cr (3.64%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹95.1 Cr+₹4.8 Cr (5.28%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹95.8 Cr+₹5.4 Cr (6.00%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹102.9 Cr
EMD Value
₹1.0 Cr
Closing Date
10 Oct 2024, 3:30 pmClosed
S.E CONSTRUCTION CIRCLE UPJN (URBAN) GORAKHPUR
OFFICE OF S.E CONSTRUCTION CIRCLE UPJN (URBAN)
CONSTRUCTION OF ALL WORK ON TURN KEY BASIS OF PADRAUNA NPP WATER SUPPLY REORGANIZATION SCHEME DISTT KUSHINAGAR
2024_UPJNM_954239_1
972/V-15/295 DATED 06.09.2024
Open Tender
Civil Works - Water Works
Percentage
730 days
NPP PADRAUNA DISTT KUSHINAGAR
As per tender notice/Documents
2 documents required · 2 mandatory
₹23,600
Executive engineer const div UPJN (U) Kushinagar
₹1.0 Cr
OFFICE OF S.E CONST CIRCLE UPJN (URBAN) GORAKHPUR
7 Jan 2025
10 Sept 2024
10 Oct 2024
10 Sept 2024
10 Oct 2024
10 Sept 2024
17 Sept 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Pump House | - | - | - | - |
| 2 | Supply of all materials, laours, T&P etc. and construct pump house cum chloronome of size ( 3.60 M x 3.0 M x 3.0 M / 2.50 M x 1.80 M x 3.0 M) with stilling chamber for tubewell, including byepass chamber. Plan , elevation & drawing attached in bid document are indicative in nature and final design & drawing will be approved as per soil test result & seismic zone plan & elevation against soil test and seismic zone. | - | - | - | - |
| 3 | Zone-3 (For T.W-1 & 2) | 2 | No. | 4,84,547.5 | ₹9,69,095 |
| 4 | Zone-4 (For T.W-1,2 & 3) | 3 | No. | 4,84,547.5 | ₹14,53,642.5 |
| 5 | Zone-5 (For T.W-1,2 & 3) | 3 | No. | 4,84,547.5 | ₹14,53,642.5 |
| 6 | Zone-7 (For T.W-1 & 2) | 2 | No. | 4,84,547.5 | ₹9,69,095 |
| 7 | Zone-9 (For T.W-1,2 & 3) | 3 | No. | 4,84,547.5 | ₹14,53,642.5 |
| 8 | Zone-10 (For T.W-1 & 2) | 2 | No. | 4,84,547.5 | ₹9,69,095 |
| 9 | REPAIR OF EXISTING PUMPHOUSE | - | - | - | - |
| 10 | Supply of all materials, laours, T&P etc. and construction work for repairing & Painting of existing pumphouse cum chloronome as per Unit Estimate / upto satisfaction of engineer in charge. | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_1657162.xls
BOQ • 1.11 MB
PADRAUNANPPTENDERDOCUMENT.pdf
Tender Documents • 4.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .