Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹22.5 L+₹3.6 L (19.2%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹22.9 L+₹4.1 L (21.5%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected |
Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
12 Aug 2023, 3:00 pmClosed
SARPANCH
GP Ale, Tal. Junner, Dist. Pune
Supply And installation 1000 LPH AND 500 LPH RO Plant With Shade Fitting. GP Ale, Tal. Junner, Dist. Pune
2023_RDPUN_932734_1
Goods1/2023-24/01
Open Tender
Electrical Goods/Equipment
Item Wise
90 days
Supply And installation 1000 LPH AND 500 LPH RO Pl
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
₹1,000
Yes
25 Sept 2023
7 Aug 2023
14 Aug 2023
7 Aug 2023
12 Aug 2023
7 Aug 2023
Supply and Installation of 1000 LPH RO Plant Water System With fully Automatic feature . RO Plnt should have have following Components / Parts: 1) Antiscalent dosing pump ------1 No. 2) Membrane (4040)--- 4 nos. 3) FRP Vessel (1054)--- 2 nos. 4) High Pressure Pump Head 2.15---- 1 no. 5) High Pressure Switch--- 1 no. 6) Raw Water Motor--- 1 no. 7) Control Panel--- 1 no. 8) Solenoid Valve--- 1 no. 9) UPVC Piping 10) Activated Carbon as required 11) Stand as required 12) Multiport Valve--2 (25nb) 13) Suitable Tank as required 14) TDS to be set at appropriate level 15) PH level should be 7.5 or suitable Value 16) Pressure gauge should be there to measure pressure of flow
Supply and Installation of 500 LPH RO Plant Water System With fully Automatic feature . RO Plnt should have have following Components / Parts: 1) Antiscalent dosing pump ------1 No 2) Membrane (4040)--- 2 nos. 3) FRP Vessel (1054)--- 2 nos. 4) High Pressure Pump Head 2.11---- 1 no. 5) High Pressure Switch--- 1 no. 6) Raw Water Motor--- 1 no. 7) Control Panel--- 1 no. 8) Solenoid Valve--- 1 no. 9) UPVC Piping 10) Activated Carbon as required 11) Stand as required 12) Multiport Valve--2 (25nb) 13) Suitable Tank as required 14) TDS to be set at appropriate level 15) PH level should be 7.5 or suitable Value 16) Pressure gauge should be there to measure pressure of flow
supply Providing and fitting of Chiller having following compnents: 1) compresser capacity of 2 Ton, brand should be of emerson or other eqivalent 2) Temperature controlar - 2 Sub Zero 3) Output display Unit Cruise PHE should be of emerson brand or equivalent .
Supply, fabricating and Installation/fitting of Cabin for RO Water Plant System of MS Sheet / Corrugated roofing sheet of dimension atleast 10 foot (Length) x 10 foot (Breadth) x 10 foot (Height). Concrete Work has to be carried out for floor of the cabin with proper finishing and strength. Windows of suitable size should be fitted for proper ventilation purpose. One Entry Door of Suitable size and proper strength should be fitted with hinges, handle and lock. Base frame and Support if required should be of MS Tubes or Pipes of Proper size and thickness.
HK ENTERPRISES
JAGRUTI ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .