Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹6.7 Cr
EMD Value
₹13.4 L
Closing Date
26 Oct 2026, 12:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE ALIGARH CIRCLE PWD ALIGARH
OFFICE OF THE SE ALIGARH CIRCLE PWD ALIGARH
New Construction of a 30 meter long minor bridge over the Karvan River in Khair town at km-58 of the Palwal-Tappal-Aligarh road (NH-334D) in Aligarh district in place of the unserviceable bridge
2026_CEALG_1193873_1
5492-Cashier (P.D.A)-A.C-26-27 dt-29.09.2026
Open Tender
Civil Works
Item Rate
300 days
OFFICE OF THE EE PD PWD ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹13.4 L
Yes
OFFICE OF THE SE ALIGARH CIRCLE PWD ALIGARH
7 Oct 2026
7 Oct 2026
26 Oct 2026
7 Oct 2026
26 Oct 2026
7 Oct 2026
24 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and Constructing Temporary Island 24m diameter for Construction of Pile Foundation. Work Shall be carried out As per Mort&h Sl. 12.09(A) and as per direction of Engineer Incharge & Including cost of all material, T&P, labour, labour cess and all other taxes but excluding G.S.T. | 1 | Nos. | - | - |
| 2 | Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter- 1200 mm) Work Shall be carried out As per MORT&H Sl. 12.25 (Including Pile Load test, Integrity test) and as per direction of Engineer Incharge & including cost of all material, T&P, labour, labour cess, royalty, ISTP and all other taxes but excluding G.S.T. | 700 | Rmt. | - | - |
| 3 | Dismantling of Reinforced Concrete Pile head complete as per Drawing and Technical Specification. Work Shall be carried out As per MORT&H Sl. 12.39 and as per direction of Engineer Incharge & including cost of all material, T&P, labour, labour cess and all other taxes but excluding G.S.T. | 30 | cum | - | - |
| 4 | Plain/Reinforced cement concrete (PCC Grade M15) in open foundation complete as per drawing and Technical Specifications. Work Shall be carried out as per MORT&H Sl. 12.08 - 1500, 1700, 2100 A-Case II and as per direction of Engineer Incharge & including cost of all material, T&P, labour, labour cess, royalty, ISTP and all other taxes but excluding G.S.T. | 24 | cum | - | - |
| 5 | Plain/Reinforced cement concrete Grade M35 in sub-structure complete as per drawing and Technical Specifications. Work Shall be carried out as per MORT&H Sl. 13.05 H (p) and as per direction of Engineer Incharge & including cost of all material, T&P, labour, labour cess, royalty, ISTP and all other taxes but excluding G.S.T. | 618 | cum | - | - |
| 6 | Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRT&H specifications complete including all accessories as per drawing and Technical Specifications. Work Shall be carried out as per MORT&H Sl. 13.16 and as per direction of Engineer Incharge & including cost of all material, T&P, labour, labour cess and all other taxes but excluding G.S.T. | 7,37,280 | cum | - | - |
| 7 | Furnishing and Placing Reinforced / Prestressed cement concrete Grade M40 in super-structure as per drawing and Technical Specification (For T-beam & slab, 23-33 per cent)/Deck Slab. Work Shall be carried out as per MORT&H Sl. 14.01E. and as per direction of Engineer Incharge & including cost of all material, T&P, labour, labour cess, royalty, ISTP and all other taxes but excluding G.S.T. | 330 | cum | - | - |
| 8 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification, Work Shall be carried out as per MORT&H Specification 170.1.4 of IRC:78 & 2200, S.I. 15.23. and as per direction of Engineer Incharge & including cost of all material, T&P, labour, labour cess, royalty, ISTP and all other taxes but excluding G.S.T. | 105 | cum | - | - |
| 9 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. Work Shall be carried out as per MORT&H Sl. 14.1A Case II. and as per direction of Engineer Incharge & including cost of all material, T&P, labour, labour cess, royalty, ISTP and all other taxes but excluding G.S.T. | 13.5 | cum | - | - |
| 10 | Reinforced cement concrete Grade M30 approach slab including reinforcement and formwork complete as per drawing and Technical specification. Work Shall be carried out as per MORT&H Sl. 14.11.and as per direction of Engineer Incharge & including cost of all material, T&P, labour, labour cess, royalty, ISTP and all other taxes but excluding G.S.T. | 27 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.61 MB
BOQ_2253314.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .