| 1 | L-1₹2.0 CrAccepted-Finance FARIDPUR PACHKHORA BALLIA U P | BALLIA | BALLIA | UTTAR PRADESH | L-1 | Accepted-Finance L-1 | |
| 2 | L-2₹2.0 Cr+₹37,925.60 (0.19%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹2.2 Cr+₹19.1 L (9.45%)Rejected-Finance AVANTIKA COLONY NEAR RICE MILL AMROHA | AMROHA | AMROHA | UTTAR PRADESH | L-3 | Rejected-Finance L-3 | |
| 4 | Not Admitted-Fee/PreQual/Technical VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/s Bansal Construction L2 | M/S RIDAM ASSOCIATES L3 | Pratap Construction L1 |
|---|---|---|---|---|---|---|
| 1.00Earth work in excavation of foundation in all types of soil, soft and hard rock etc. including all cost of material labour charges T&P etc required for proper completion of works | ||||||
| 1.10 | (i) Soft rock/Soil | 3,577.65 | M3 | 85 ₹3,04,100.25 | 100 ₹3,57,765 | 70 ₹2,50,435.5 Lowest |
| 1.20 | (iI) Hard rock/Soil | 2,749.53 | M3 | 135 ₹3,71,186.55 Lowest | 150 ₹4,12,429.5 | 150 ₹4,12,429.5 |
| 2.00 | Laying C.C. 1:3:6 (M-10) in foundation with cement coarse sand FM not less than 2.0 and hard stone ballast of size 20 to 40 mm including all cost of material labour charges T&P etc required for proper completion of works . | 137.31 | M3 | 3,800 ₹5,21,778 Lowest | 4,010 ₹5,50,613.1 | 3,886 ₹5,33,586.66 |
| 3.00 | centering and shuttering for R.C.C. work including all cost of labour charges, T&P etc required for proper completion of works .in structure | 2,522.58 | m2 | 390 ₹9,83,806.2 | 400 ₹10,09,032 | 370 ₹9,33,354.6 Lowest |
| 4.00 | centering and shuttering of enclose filter in side of Retaining wall including all cost of labour charges, T&P etc. required for Proper completion of works | 1,785 | m2 | 55 ₹98,175 Lowest | 60 ₹1,07,100 | 66 ₹1,17,810 |
| 5.00 | Providing M-20 (1:1.5:3) R.C.C. with 4.75 mm to 20 mm size graded hard stone grit and coarse sand by machnical mixing with all materials , labour, T&P. etc. requaied for proper completion of works | 1,376.55 | M3 | 5,150 ₹70,89,232.5 Lowest | 5,700 ₹78,46,335 | 5,286 ₹72,76,443.3 |
| 6.00 | Cutting, bending , binding and placing of reinforcement including all cost of labour charges T&P etc. required for proper completion of work | 104.29 | MT | 68,500 ₹71,44,002 | 78,000 ₹81,34,776 | 66,000 ₹68,83,272 Lowest |
| 7.00 | P.V.C. Pipe in weep hole 100 mm dia including cutting , placing , all cost of laboure charges T&P etc. required for proper completion of works @ 2.50 m c/c | 40.8 | RM | 240 ₹9,792 | 250 ₹10,200 | 186 ₹7,588.8 Lowest |
| 8.00 | Laying and Fixing joint Filler board /coir soaked with bitumen in seal gap 18 mm thick including cutting, placing , all cost of material, labour charges T&P etc. required for proper completion of works | 74.34 | m2 | 500 ₹37,170 | 550 ₹40,887 | 486 ₹36,129.24 Lowest |
Tender Value
Refer Docs
EMD Value
₹4.4 L
Closing Date
23 Jul 2026, 2:00 pmClosed
S.E. B.S.C.C.C.-2, Mzp
Office of Superintending Engineer, Bansagar Canal Construction Circle-2 Mirzapur
Constructoin of Retaining wall for R/B of Canal Safety from Km. 25.005 to Km. 25.090 of B.S.F.C.
2026_UPIDC_1168208_4
03/SE/2026-27
Open Tender
Civil Works
Item Rate
330 days
Sidhi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹4.4 L
6 Oct 2026
10 Jul 2026
23 Jul 2026
10 Jul 2026
23 Jul 2026
14 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation of foundation in all types of soil, soft and hard rock etc. including all cost of material labour charges T&P etc required for proper completion of works | |||||
| 1.1 | (i) Soft rock/Soil | 3,577.65 | M3 | - | - |
| 1.2 | (iI) Hard rock/Soil | 2,749.53 | M3 | - | - |
| 2 | Laying C.C. 1:3:6 (M-10) in foundation with cement coarse sand FM not less than 2.0 and hard stone ballast of size 20 to 40 mm including all cost of material labour charges T&P etc required for proper completion of works . | 137.31 | M3 | - | - |
| 3 | centering and shuttering for R.C.C. work including all cost of labour charges, T&P etc required for proper completion of works .in structure | 2,522.58 | m2 | - | - |
| 4 | centering and shuttering of enclose filter in side of Retaining wall including all cost of labour charges, T&P etc. required for Proper completion of works | 1,785 | m2 | - | - |
| 5 | Providing M-20 (1:1.5:3) R.C.C. with 4.75 mm to 20 mm size graded hard stone grit and coarse sand by machnical mixing with all materials , labour, T&P. etc. requaied for proper completion of works | 1,376.55 | M3 | - | - |
| 6 | Cutting, bending , binding and placing of reinforcement including all cost of labour charges T&P etc. required for proper completion of work | 0.8 | MT | - | - |
| 7 | P.V.C. Pipe in weep hole 100 mm dia including cutting , placing , all cost of laboure charges T&P etc. required for proper completion of works @ 2.50 m c/c | 40.8 | RM | - | - |
| 8 | Laying and Fixing joint Filler board /coir soaked with bitumen in seal gap 18 mm thick including cutting, placing , all cost of material, labour charges T&P etc. required for proper completion of works | 74.34 | m2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
Lot_4.pdf
Tender Documents • 3.49 MB
BOQ_2191206.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .