Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 CrAccepted-AOC | ₹9.9 Cr Quoted ₹9.5 Cr | L1 | Accepted-AOC 99144246.16 |
| 2 | L2₹9.6 Cr+₹6.1 L (0.64%)Rejected-Finance SURYA FACTORY SORAN ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹9.6 Cr+₹6.1 L (0.64%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹10.2 Cr+₹70.2 L (7.36%)Rejected-Finance | ₹10.2 Cr+₹70.2 L (7.36%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹10.7 Cr+₹1.2 Cr (12.2%)Rejected-Finance C BLOCK VISHAL ENCLAVE NEW DELHI 27 | NEW DELHI | DELHI | 110001 | ₹10.7 Cr+₹1.2 Cr (12.2%) | L4 | Rejected-Finance Rejected |
| 5 | Rejected-Technical MOH LALA TELI KI BAZARIYA SHAHJAHANPUR | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹14.9 Cr
EMD Value
₹30 L
Closing Date
25 Feb 2025, 12:00 pmClosed
SE BLY CIRCLE PWD BLY
SE BLY CIRCLE PWD BLY
Widening and Strengthening of Pilibhit Basti Road to Bela Jograjpur Harnai Road (ODR) Ch. 0.00-9.30 and Ch. 14.50-15.50 Km. In Distt Shahjahanpur (Fin Year 2024-25)
2025_CEBLY_1007250_1
1569/141C(E-Tender)-3/25 Dt. 10-02-2025
Open Tender
Civil Works - Roads
Item Wise
365 days
SHAHJAHANPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,725
₹30 L
Yes
SE BLY CIRCLE PWD BLY
23 Mar 2025
17 Feb 2025
25 Feb 2025
17 Feb 2025
25 Feb 2025
17 Feb 2025
17 Feb 2025
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of embankment with approved material obtained from borrow pits with all lifts and leads,spreading,grading to required slope and compacted to meet requirement of table 300-2, MORT&H Specification-305. (For Carted Earth upto 2.0 Km).
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2(Carted Earth Upto 2 Km.)
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (3.50% Emulsion + 1% Cement)
Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with machanical broom .
Providing and laying bituminious concrete with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40% as per job mix and filler, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 507 complete in all respects.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per direction fo E/I As per Ref to MoRTH specifications 602 Sr.No 6.2
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (Mechanical means
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
RCC Grade M25- using batching plant transit mixer & Concrete pump
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
Bricks Ballast 40 mm gauge filling behind abutment, wing wall & return wall complete as per drawing & technical specification.
M-20 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and as per MORT&H Specification Clause 1500, 1700 & 2100.
Providing and laying reinforced cement concrete pipe NP3 1000mm dia for culverts on first class bedding of granular material in Single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Providing and laying reinforced cement concrete pipe NP3 600mm dia for culverts on first class bedding of granular material in Single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Fixing Km, stoen, hectometer stone etc complete. Miscellanious work as lattering and painting on km, hectometer stones and culvert provision.
M/s Hanu Infrastructure Pvt Ltd (BID ID -4997025)
HINDUSTAN STEELS (BID ID -4998004)
rohit construction company (BID ID -4988924)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1804403.xls
BOQ • 0.24 MB
163593357.pdf
Tender Documents • 1.05 MB
163593360.html
Tender Documents • 0.05 MB
Addendum.pdf
Tender Documents • 1.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .