| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 CrAccepted-AOC 2ND FLOOR KAPIL CENTER 2ND MILE SEVOKE ROAD SILIGURI 734001 | SILIGURI | JALPAIGURI | WEST BENGAL | 734001 | ₹9.1 Cr | L1 | Accepted-AOC Being Lowest Bidder and reasonable bid |
| 2 | L2₹9.8 Cr+₹68.0 L (7.47%)Rejected-Finance | ₹9.8 Cr+₹68.0 L (7.47%) | L2 | Rejected-Finance Other than Lowest Bidder |
| 3 | L3₹10.0 Cr+₹87.9 L (9.66%)Rejected-Finance STREET NO 11 SECTOR NO 04 TILAK NAGAR SAGAR ROAD BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | ₹10.0 Cr+₹87.9 L (9.66%) | L3 | Rejected-Finance Other than Lowest Bidder |
| 4 | L4₹10.0 Cr+₹89.4 L (9.84%)Rejected-Finance 61 LAALA LAJPAT RAI COLONY BHOPAL M P 462023 | BHOPAL | MADHYA PRADESH | 462023 | ₹10.0 Cr+₹89.4 L (9.84%) | L4 | Rejected-Finance Other than Lowest Bidder |
| 5 | L5₹10.9 Cr+₹1.8 Cr (19.3%)Rejected-Finance | ₹10.9 Cr+₹1.8 Cr (19.3%) | L5 | Rejected-Finance Other than Lowest Bidder |
| Sl No | Description | Qty | Unit | Raja enterprises L2 | M/s Khialdas Constructions L5 | Jasraj & Company L3 | SHREE KRISHNA INFRASTRUCTURE L4 | J R INFRATECH L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Note:- 1. Please refer schedule 'A' notes before quoting the tender. 2. Amount of schedule of credit shall be deducted offline by department . | ||||||||
| 2.00GENERAL SUMMARY | ||||||||
| 3.00 | Schedule 'A' Part-I ( Building Works )
Design and M&L for construction of Pre-engineered building for block of Simulator room sheds with entrance lobby, toilet, platform, ramps, brick steps, 900mm wide plinth protection all around without drain and including only marking/showing of electrical fittings and fixtures on drawing as per standared norms, with height of 6.06m at location specified on plan and as per parameters/ specification provided in DBR & Particular Specification (PS)
Note:- The complete design of the buildings mentioned under sch 'A' Part-I shall be carried out and design and drawings shall be got vetted from any IIT & also refer scope of mentioned in Sch 'A' Notes and details of scope under Phase-I, Phase-II and Phase-III. The contarctor shall also submit detail estimate alongwith with yard stick for approval of CWE as per Annex 'B' to Sch 'A' Notes & the cost of these provision shall be deemed to be included in qouted rate against this item. | 1 | EACH JOB | 3,88,00,000 ₹3,88,00,000 | 4,84,78,248 ₹4,84,78,248 | 3,43,00,000 ₹3,43,00,000 | 3,06,00,000 ₹3,06,00,000 | 2,87,30,358.96 ₹2,87,30,358.96 Lowest |
| 4.00 | Lump sum price worked out by the contractor for BUILDING WORKS as listed in Schedule ‘A’ Part-II (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 3,28,20,000 ₹3,28,20,000 | 3,74,92,875 ₹3,74,92,875 | 3,86,05,767.2 ₹3,86,05,767.2 | 4,05,00,000 ₹4,05,00,000 | 3,21,42,306.44 ₹3,21,42,306.44 Lowest |
| 5.00 | Lump sum price worked out by the contractor for SCHEDULE ‘A’ PART- III (INTERNAL WATER SUPPLY WORKS) as listed in Schedule ‘A’ Part- III (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 1,26,950 ₹1,26,950 | 1,75,635 ₹1,75,635 | 1,07,395 ₹1,07,395 Lowest | 1,71,000 ₹1,71,000 | 1,27,314.58 ₹1,27,314.58 |
| 6.00 | Lump sum price worked out by the contractor for SCHEDULE ‘A’ PART-IV (INTERNAL ELECTRIFICATION WORKS ) as listed in Schedule ‘A’ Part -IV (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 25,87,000 ₹25,87,000 | 15,79,743 ₹15,79,743 Lowest | 19,45,684.95 ₹19,45,684.95 | 20,70,000 ₹20,70,000 | 27,77,759.15 ₹27,77,759.15 |
| 7.00 | Lump sum price worked out by the contractor for SCHEDULE ‘A’ PART-V (EXTERNAL WATER SUPPLY WORKS) as listed in Schedule ‘A’ Part-V (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 2,27,000 ₹2,27,000 | 1,56,275 ₹1,56,275 | 1,14,208.7 ₹1,14,208.7 Lowest | 1,71,000 ₹1,71,000 | 1,48,394.15 ₹1,48,394.15 |
| 8.00 | Lump sum price worked out by the contractor for SCHEDULE 'A' PART-VI (SEWAGE DISPOSAL AND RCC SEPTIC TANK WORKS) as listed in Schedule ‘A’ Part-VI (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 8,34,000 ₹8,34,000 | 1,92,300 ₹1,92,300 Lowest | 7,27,317.15 ₹7,27,317.15 | 8,10,000 ₹8,10,000 | 8,22,154.45 ₹8,22,154.45 |
| 9.00 | Lump sum price worked out by the contractor for SCHEDULE ‘A’ PART-VII (AREA DRAINAGE WORKS) as listed in Schedule ‘A’ Part-VII (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 21,91,000 ₹21,91,000 | 18,20,360 ₹18,20,360 Lowest | 20,77,655.55 ₹20,77,655.55 | 24,30,000 ₹24,30,000 | 22,16,789.19 ₹22,16,789.19 |
| 10.00 | Lump sum price worked out by the contractor for SCHEDULE 'A' PART- VIII (COMPOUND WALL, FENCING AND GATE WORKS) as listed in Schedule ‘A’ Part-VIII (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 13,50,000 ₹13,50,000 | 10,45,880 ₹10,45,880 Lowest | 11,87,852.75 ₹11,87,852.75 | 11,70,000 ₹11,70,000 | 11,84,508.82 ₹11,84,508.82 |
Tender Value
₹10.2 Cr
EMD Value
₹8.4 L
Closing Date
31 Jan 2026, 6:00 pmClosed
CHIEF ENGR, BHOPAL ZONE
HQ CHIEF ENGR BHOPAL ZONE, MES SI LINE BHOPAL 462001
PROVN OF SIMULATOR ROOMS WITH STAND BY POWER ARRANGEMENT AT P COY TRAINING AREA, 3 EME CENTRE BHOPAL UNDER GE DRONACHAL
2025_MES_746254_1
CEBZ/BPL/TOKEN/19 OF 2025-26
Open Tender
Civil Works
Lump-sum
540 days
Dronachal
As per NIT Document
7 documents required · 7 mandatory
₹3,000
GE Dronachal
₹8.4 L
Bhopal
20 Jun 2026
26 Dec 2025
2 Feb 2026
26 Dec 2025
31 Jan 2026
24 Jan 2026
12 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2GENERAL SUMMARY | |||||
| 3 | Schedule 'A' Part-I ( Building Works )
Design and M&L for construction of Pre-engineered building for block of Simulator room sheds with entrance lobby, toilet, platform, ramps, brick steps, 900mm wide plinth protection all around without drain including internal services with height of 6.06m at location specified on plan and as per parameters/ specification provided in DBR & Particular Specification (PS)
Note:- The complete design of the buildings mentioned under sch 'A' Part-I shall be carried out and design and drawings shall be got vetted from any IIT & also refer scope of mentioned in Sch 'A' Notes and details of scope under Phase-I, Phase-II and Phase-III. The contarctor shall also submit detail estimate alongwith with yard stick for approval of CWE as per Annex 'B' to Sch 'A' Notes & the cost of these provision shall be deemed to be included in qouted rate against this item. | 1 | EACH JOB | - | - |
| 4 | Lump sum price worked out by the contractor for BUILDING WORKS as listed in Schedule ‘A’ Part-II (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 3,67,43,552.76 | ₹3,67,43,552.76 |
| 5 | Lump sum price worked out by the contractor for SCHEDULE ‘A’ PART- III (INTERNAL WATER SUPPLY WORKS) as listed in Schedule ‘A’ Part- III (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 1,39,053.89 | ₹1,39,053.89 |
| 6 | Lump sum price worked out by the contractor for SCHEDULE ‘A’ PART-IV (INTERNAL ELECTRIFICATION WORKS ) as listed in Schedule ‘A’ Part -IV (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 20,07,868.86 | ₹20,07,868.86 |
| 7 | Lump sum price worked out by the contractor for SCHEDULE ‘A’ PART-V (EXTERNAL WATER SUPPLY WORKS) as listed in Schedule ‘A’ Part-V (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 1,08,388.04 | ₹1,08,388.04 |
| 8 | Lump sum price worked out by the contractor for SCHEDULE 'A' PART-VI (SEWAGE DISPOSAL WORKS) as listed in Schedule ‘A’ Part-VI (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 1,87,410.68 | ₹1,87,410.68 |
| 9 | Lump sum price worked out by the contractor for SCHEDULE ‘A’ PART-VII (AREA DRAINAGE WORKS) as listed in Schedule ‘A’ Part-VII (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 23,17,501.2 | ₹23,17,501.2 |
| 10 | Lump sum price worked out by the contractor for SCHEDULE 'A' PART- VIII (COMPOUND WALL, FENCING AND GATE WORKS) as listed in Schedule ‘A’ Part-VIII (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 12,50,371.31 | ₹12,50,371.31 |
| 11 | Lump sum price worked out by the contractor for SCHEDULE 'A' PART- IX (ROAD, PATH AND CULVERT WORKS) as listed in Schedule ‘A’ Part-IX (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 27,40,522.67 | ₹27,40,522.67 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.75 MB
BOQ_835624.xls
BOQ • 0.83 MB
tender.pdf
Tender Documents • 8.42 MB
drgsmerged.pdf
Tender Documents • 30.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .