Loading…
Loading…
Tender Value
₹19.4 Cr
EMD Value
₹38.9 L
Closing Date
13 Jul 2026, 11:30 am
Similar tender results from the same govt authority in the past 3 years.
EXECUTIVE ENGINEER
Executive Engineer Construction Division PWD B and R Rupnagar
Construction of Govt ITI Building G plus 5 Centre of Excellence at Nangal Distt Ropar
2026_CEPW_170505_1
Tender Notice No. 9 Dated 19.06.2026
Open Tender
Civil Works - Buildings
365 days
Rupnagar
Please refer Tender documents.
6 documents required · 6 mandatory
₹50,000
₹38.9 L
Yes
S E CONSTN CIRCLE PWD B AND R CHANDIGARH
20 Jun 2026
20 Jun 2026
13 Jul 2026
20 Jun 2026
13 Jul 2026
20 Jun 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work
Construction of ITI Building (G+5)-RCC Framed Structure
Excavation in soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar uopt 40%^ excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 meters. | - | cum | 102.19 | - |
| 2 | Providing and applying Anti Termite Treatment using pre constructional chemical treatment measures as per IS-6313-2001(Part 2) & using Chemical containg chloropyrifos systemic insecticide diluted to manufacturer's specifications (i) In foundation pits, by treating the bottom & sides upto height of 300mm by uniformly spraying solution @ 5 Litre / Sqm (ii) In the refill earth on both sides of all built up walls @7.5 Litre / Running meter ( width- 300 mm, depth- 450 mm) (iii) Before laying the floor, by uniformly sprinkling the top surface of the consolidated earth within the outer perimeter @ 5 Litre solution per Sqm. | - | ltr | 391.9 | - |
| 3 | Cement Concrete 1:4:8 with stone ballast of size. Using concrete mixer volumetric type. | - | cum | 4,401.74 | - |
| 4 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 1 | sqm | 221.24 | ₹221.01 |
| 5 | Centering and shuttering for columns (Square or rectangular or poly gonal in plain) | - | sqm | 502.52 | - |
| 6 | Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering including attached pilasters buttresses etc. | 1,195.26 | sqm | 426.67 | ₹5,09,978.6 |
| 7 | Reinforced cement concrete M-30 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 1,145.31 | cum | 6,302.49 | ₹72,18,304.82 |
| 8 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 15.47 | cum | 5,728.33 | ₹88,617.27 |
| 9 | First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth. | 149.4 | cum | 6,024.38 | ₹9,00,042.37 |
| 10 | Damp proof course 4 cm thick of cement concrete 1 : 2 : 4 with 2 coats of bitument 20/30 penetration at 1.65 kg per Sqm. laid hot and sanded. | 120.89 | sqm | 361.37 | ₹43,686.02 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
DNITofITINangalG5.pdf
Tender Documents • 34.03 MB
BOQ_347143.xls
BOQ • 0.78 MB
Download all tender documents and submit your bid