Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical H NO 2 88 A THAKUR WADA OLD FARIDABAD 121002 | FARIDABAD | FARIDABAD | HARYANA | 121002 | Not Admitted-Fee/PreQual/Technical Others-Qualified, but due to single bid, tender will be reinvited |
| 2 | Not Admitted-Fee/PreQual/Technical OLD GT ROAD NEAR MINAR GATE PALWAL HARYANA 121102 | PALWAL | PALWAL | HARYANA | 121102 | Not Admitted-Fee/PreQual/Technical Others-bids recieved from same ip address |
| 3 | Not Admitted-Fee/PreQual/Technical HNO 2240 HUDA SECTOR 2 PALWAL HARYANA 121102 | PALWAL | PALWAL | HARYANA | 121102 | Not Admitted-Fee/PreQual/Technical Others-bids recieved from same ip address |
Tender Value
₹1.5 L
EMD Value
₹3,020
Closing Date
7 Jul 2026, 5:00 pmClosed
MANOJ SAINI
DIV Palwal
HEW 80 Providing and fixing RCC Slab, dismantling RCC Slab and wall painting at entry point in Sector 2 Palwal
2026_HBC_532722_1
202646C0A1D2 B88D 4BC6 8366 59F0B6F9B716251HSV
Open Tender
Civil Works
Works
30 days
Palwal
as per dnit
2 documents required · 2 mandatory
₹250
Yes
₹3,020
Yes
8 Jul 2026
1 Jul 2026
8 Jul 2026
1 Jul 2026
7 Jul 2026
1 Jul 2026
1 Jul 2026 - 3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | wall painting at entry Point in Sector-2, Palwal | 115 | Sqm | 715 | ₹82,225 |
| 2 | [11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand) | 20 | Sqm | 139 | ₹2,780 |
| 3 | [21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening | 6 | Each | 1,155 | ₹6,930 |
| 4 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil | 6 | cum | 78 | ₹468 |
| 5 | [5.25]Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 2.42 | cum | 1,562 | ₹3,780.04 |
| 6 | [5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar | 2.3 | cum | 585 | ₹1,345.5 |
| 7 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 0.9 | cum | 3,975 | ₹3,577.5 |
| 8 | [6.2.1]Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor four level, excluding the cost of centering, shuttering and finishing: 1. 1:1½:3 (1 cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 2.42 | cum | 3,982 | ₹9,636.44 |
| 9 | [6.34.1]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 1. Mild steel and Medium Tensile steel bars | 469.2 | Kg. | 65.94 | ₹30,939.05 |
| 10 | [7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) | 2.3 | cum | 4,128 | ₹9,494.4 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_611792.xls
BOQ • 0.36 MB
FXAEC9Z169575.pdf
Additional Documents • 0.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .