Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical QUALIFIED |
| 2 | Accepted-Technical | Accepted-Technical QUALIFIED |
| 3 | Accepted-Technical | Accepted-Technical QUALIFIED |
| 4 | Accepted-Technical A 94 SECTOR P 3 GREATER NOIDA G B NAGAR | GREATER NOIDA | G B NAGAR | U P | Accepted-Technical QUALIFIED |
| 5 | Accepted-Technical | Accepted-Technical QUALIFIED |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
18 Jun 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of RCC Drain Covering of Left Side along 120 mtr. wide road Ch. 2.00 km to 4.50 km Sector-18, YEA. WC-06
2026_YEIDA_1157329_22
YEA/GM(PROJECT)/2026/517 DT-04/06/2026
Open Tender
Civil Works
Fixed-rate
180 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,975
₹3.6 L
9 Oct 2026
9 Jun 2026
19 Jun 2026
9 Jun 2026
18 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in ordinary soil in all type of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.50m including getting out the excevated soil and disposal of surplus excavated soil as direction within a lead of 50m all kinds of soil. (MORTH/AR/YEIDA/BASED ON UPPWD/SOR-2020) | 2,528.43 | CUM | 87.36 | ₹2,20,883.64 |
| 2 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. All works up to plinth level. (SOR) | 904.11 | CUM | 7,849.65 | ₹70,96,947.06 |
| 3 | Centering and shuttering including strutting, propping etc. Edges of Slabs and breaks in floors and walls, under 20 cm wide. Based on UPPWD/SOR/ 2020 /DAR/18/5.9.16.1 | 892.17 | SQM | 127.4 | ₹1,13,662.46 |
| 4 | Centering and shuttering including strutting, propping etc. Suspended floors, roofs, landings, balconies and access platform. Based on UPPWD/SOR/ 2020 /DAR/18/5.9.3 | 5,087.4 | SQM | 399.7 | ₹20,33,433.78 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars/Cold twisted bars. | 95,813.06 | KG | 88.1 | ₹84,41,130.59 |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.09 MB
22.pdf
Tender Documents • 2.45 MB
BOQ_2168840.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .