| 1 | L1₹53,100Accepted-AOC | L1 | Accepted-AOC L1 FOR SL.NO1 | |
| 2 | L1₹5.1 LAccepted-AOC | L1 | Accepted-AOC L2 FOR SL.NO 2 | |
| 3 | L2₹7.3 LRejected-AOC | L2 | Rejected-AOC L2 | |
| 4 | L3₹7.5 LRejected-AOC | L3 | Rejected-AOC L3 | |
| 5 | Rejected-Technical | - | Rejected-Technical gst CANCELLED W.E.F 13 /01/2021 |
| Sl No | Description | Qty | Unit | R.S. CONSTRUCTION L1 | CAREWELL CONSTRUCTION L3 | N K CONSTRUCTION L4 | MAHAK ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|
| 1.00Part A | |||||||
| 1.01 | Lifting of Chemicals from O&M Store-II and its transportation to ETP, D.M. Plant, PH-IV (2x250 MW), Unifilter Plant Purolator Plant, Shed near Clearifier of A.B. Type colony Domestic Water Supply etc., through the departmental vehicle or unloading from truck direct at different site, and stacking of unloading Chemicals at ETP, D.M. Plant of unit No. 10 & 11, PH-IV (2x250 MW), Unifilter, Purolator Plant, Shed near Clearifier of A.B. Type colony Domestic Water Supply etc., lifting of Chemicals from one site to another site. | 500 | MT | 1,29,700 ₹1,53,045 | 1,35,000 ₹1,59,300 | 1,12,000 ₹1,32,160 | 45,000 ₹47,250 Lowest |
| 2.00Part B | |||||||
| 2.01 | 1.Work Contract for shifting of filled Hydrogen Cylinders from Hydrogen Plant-2 and 3 to Unit 10 & 11 (2x250MW). 2.Shifting of Empty Hydrogen Cylinders Unit 10 & 11 to Hydrogen Plant 2 and 3. 3.Supply of Filled Hydrogen Cylinders STPS, Sarni to other power station of MPPGCL. 4.Sending of empty Hydrogen Cylinders which HST (Hydrostatic Stretch Test) due on. | 10,000 | Nos | 4,32,000 ₹5,09,800 Lowest | 4,80,000 ₹5,66,400 | 5,20,000 ₹6,13,600 | 5,50,000 ₹6,49,000 |
Tender Value
₹8.1 L
EMD Value
₹16,300
Closing Date
7 Mar 2024, 3:00 pmClosed
SE
CE GEN SARNI
Work of lifting of heavy chemicals and shifting of hydrogen cylinders at STPS Sarni
2023_MPPGC_319949_1
WT4506
Open Tender
Miscellaneous Works
Fixed-rate
365 days
Sarni
as per pqr
11 documents required · 11 mandatory
₹500
Yes
₹16,300
Yes
18 Sept 2025
9 Feb 2024
7 Mar 2024
9 Feb 2024
7 Mar 2024
9 Feb 2024
Part A
Lifting of Chemicals from O&M Store-II and its transportation to ETP, D.M. Plant, PH-IV (2x250 MW), Unifilter Plant Purolator Plant, Shed near Clearifier of A.B. Type colony Domestic Water Supply etc., through the departmental vehicle or unloading from truck direct at different site, and stacking of unloading Chemicals at ETP, D.M. Plant of unit No. 10 & 11, PH-IV (2x250 MW), Unifilter, Purolator Plant, Shed near Clearifier of A.B. Type colony Domestic Water Supply etc., lifting of Chemicals from one site to another site.
Part B
1.Work Contract for shifting of filled Hydrogen Cylinders from Hydrogen Plant-2 and 3 to Unit 10 & 11 (2x250MW). 2.Shifting of Empty Hydrogen Cylinders Unit 10 & 11 to Hydrogen Plant 2 and 3. 3.Supply of Filled Hydrogen Cylinders STPS, Sarni to other power station of MPPGCL. 4.Sending of empty Hydrogen Cylinders which HST (Hydrostatic Stretch Test) due on.
MAHAK ENTERPRISES
CAREWELL CONSTRUCTION
N K CONSTRUCTION
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .