Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹10.1 LAWARDED | AWARDED |
Tender Value
₹12.0 L
EMD Value
₹30,000
Closing Date
26 Mar 2025, 9:30 pmClosed
Directorate of Municipal Administration
Improvement of Government Higher Primary School-12 in Bhankapur ChouckAt ward no-70
DMA/2024-25/BD/WORK_INDENT34626
DMA/2024-25/BD/WORK_INDENT34626
Open
Buildings
Electronic Documents, First(One Cover)
DMA City Corporation Hubballi-Dharawada
₹500
₹30,000
11 Mar 2025
11 Mar 2025
20 Mar 2025
Improvement of Government Higher Primary School-12 in Bhankapur ChouckAt ward no-70
Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means
Dismantling of existing structures like culverts, bridges, retainingwalls and other structure comprising of masonry, cement concrete,wood work, steel work, including T&P and scaffolding wherevernecess...
Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and te...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work
Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes m...
Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine agg...
Providing and laying in position Cement Concrete for all Super structures ofbuilding , Road works, Water works, Irrigation works & super structure worksof bridges upto 3.50 m height. The granite/trap/...
Additionalities for Formwork, Centering & Scaffolding foundation all Basement Finished rate of column footing concrete per m3
Additionalities for Formwork, Centering & Scaffolding foundation all Basement Finished rate of plinth Beam concrete per m3 50%
Additionalities for Formwork, Centering & Scaffolding Columns Super structrue 70% percentage to be added to the finished rate of concrete
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing Brick work with common burnt clay Non Modular bricksof class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1cement : 6 coarse sand) including cost of all materials, labour, ...
Providing 12 mm cement plaster with cement mortar 1:4 (1 cement:4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding,incl...
Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade afterthoroughly brooming the surface to remove all dirt, dust, m...
Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes m...
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openi...
Providing and laying 80mm thick factory made precast M -30grade Cement Concrete Paver Block as per IRC SP 63:2018 &IS 15658 for Cycle Tracks & Pedestrian Footpaths of approvedshape and colour, laid in...
Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long bracket...
Providing & fixing 30mm thick factory made rigid foam Prelam PanelledDoor Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and15x15mm for top & bottom rails, covered with heat moulded Prel...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .