Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC TAKDAH T E DARJEELING | DARJEELING | DARJEELING | WEST BENGAL | ₹1.6 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹1.6 LRejected-Finance HUM BUSTY P O TAKDAH CANT DARJEELING | DARJEELING | WEST BENGAL | 734001 | ₹1.6 L | L2 | Rejected-Finance L2 |
| 3 | L3₹1.6 LRejected-Finance | ₹1.6 L | L3 | Rejected-Finance L3 |
Tender Value
₹1.6 L
EMD Value
₹3,296
Closing Date
14 Jan 2026, 5:55 pmClosed
Block Development Officer
Rangli Rangliot Dev. Block, Takdah
Construction of Box Drain from Chatraman Bharali to Rangli Khola, Maneydara GP
2025_DMD_977622_8
40/RR/BDO/APAS/2025-26, Date- 22/12/2025, Second Call
Open Tender
CIVIL WORKS
30 days
Maneydara
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,296
26 May 2026
22 Dec 2025
17 Jan 2026
23 Dec 2025
14 Jan 2026
23 Dec 2025
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.
Cost of Boulder
(I) Cement concrete with graded stone ballast (40 mm size) excluding shuttering.In ground floor.
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].
Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
Display Board
Add GST 18%
Add Cess 1%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_2382676.xls
BOQ • 0.29 MB
SBD.pdf
Tender Documents • 0.38 MB
Download all tender documents and submit your bid